Weekly market checklist

A weekly market runs smoothly when the practical details are settled before the first stall arrives. This checklist takes you from permits and exhibitor registrations through layout, access, power, refreshments and site setup. It also covers the jobs that are easy to leave too late, such as confirming dietary requirements, arranging waste collection and checking the weather. Use it to keep 43 planning and setup tasks in sequence, with the required furniture, equipment, lighting and serving items ready for market day.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Check the market permit

  • Confirm market location

  • Work out market layout

    2 people

  • Invite exhibitors

  • Process registrations

  • Assign pitch locations

    2 people

  • Collect dietary requirements

  • Reserve power outlets

  • Arrange waste collection

  • Set out the access route

    2 people

  • Publish promotion

  • Send exhibitor information

  • Check the weather forecast

  • Do the shopping

    2 people

  • Collect materials

    2 people

  • Load market materials

    3 people

  • Inspect the grounds

    2 people

  • Set up tents

    4 people

  • Set up tables

    3 people

  • Set up chairs

    2 people

  • Connect power

    2 people

  • Hang lighting

    2 people

  • Place signs and direction arrows

    2 people

  • Set up the information desk

    2 people

  • Set up coffee station

    2 people

Event

  • Welcome exhibitors

    3 people

  • Assign stand locations

    2 people

  • Check booth presentations

    2 people

  • Serve coffee and tea

    2 people

  • Staff the information point

  • Refill drinks

  • Empty trash bins

    2 people

  • Check the lighting

  • See exhibitors off

    2 people

Aftercare

  • Dismantle stalls and tables

    4 people

  • Take down tents

    4 people

  • Collect waste

    3 people

  • Clean the grounds

    3 people

  • Disconnect the power supply

    2 people

  • Return materials

    3 people

  • Wash dishes

    2 people

  • Clean reusable items

    2 people

  • Return deposit and keys

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Party tentsqty 6
  • Market stallsqty 12
  • Foldable tablesqty 8
  • High tablesqty 6
  • Folding chairsqty 24
  • Tableclothsqty 12
  • Plastic cratesqty 20
  • Parasol basesqty 6
  • Flip chartsqty 6
  • Crowd control barriersqty 10
  • Conesqty 12
  • Ratchet strapsqty 12
  • Tent weightsqty 24

Equipment

  • Coffee machinesqty 2
  • Kettlesqty 2
  • Hot drink urnsqty 4
  • Coolersqty 4
  • Extension cordsqty 6
  • Power stripsqty 6
  • Cable matsqty 8
  • Measuring tapeqty 2
  • Cordless screwdriversqty 2
  • Tool casesqty 2
  • Cash drawersqty 4
  • Cash machinesqty 2
  • Power banksqty 4

Lighting

  • LED string lightsqty 6
  • LED work lightsqty 4
  • Batteriesqty 24

Tableware

  • Reusable cupsqty 150
  • Coffee cupsqty 80
  • Platesqty 80
  • Cutlery setsqty 80
  • Serving spoonsqty 6

Decorations

  • Market flagsqty 12
  • Announcement signsqty 4
  • Route arrowsqty 10
  • Price sign holdersqty 30
  • Name badgesqty 30
  • Pensqty 12
  • Clipboardsqty 4
  • A4 information sleevesqty 20

Catering

  • Groceries

Cleaning

  • Waste binsqty 8
  • Waste sorting binsqty 4
  • Broom setsqty 3
  • Litter pickersqty 3
  • Bucketsqty 4
  • Mopsqty 4
  • Work glovesqty 8
  • Toilet cleaning wipesqty 4

Tips

  • Confirm the permit and location before inviting exhibitors. The layout, access route and number of available pitches depend on these details, so do not assign pitch locations until registrations are processed.
  • Reserve power outlets early and mark them on the layout. Count coffee machines, kettles, lighting and other connections, then prepare extension cords, power strips and cable mats before loading the market materials.
  • Send exhibitors their practical information at least 7 days before the market. Include arrival instructions, pitch locations, the access route, setup times and any rules about power, waste and food information.
  • Check the forecast 24 hours before setup and again on the morning itself. This gives you time to adjust tent positions, secure parasol bases, protect materials and decide whether extra cover or lighting is needed.
  • Set up the information desk and coffee station before exhibitors arrive. Place route arrows and announcement signs where visitors make decisions, and keep reusable cups, coffee cups, plates and serving utensils together rather than in separate crates.

Frequently asked questions

How far in advance should I organise a weekly market?
Start the permit, location and exhibitor planning at least 4 to 6 weeks ahead. Finalise registrations, pitch assignments, dietary requirements and power needs no later than 7 days before the market.
How many tables and chairs do I need for a weekly market?
Count one pitch at a time from the confirmed layout, then add around 10% spare seating or tables where storage allows. Include separate furniture for the information desk, coffee station and any high-traffic service area.
When should I check the weather for a weekly market?
Check it 24 hours before setup and once more on the morning of the market. Use the forecast to review tents, parasol bases, lighting, access routes and any materials that could be damaged by rain or wind.
What should I prepare for the coffee station at a market?
Prepare coffee machines, kettles or hot drink urns, suitable cups, reusable cups, serving spoons and access to power. Set the station up before opening and allow at least 30 minutes for connection, filling and a safety check.

Start this plan in Lizzt

Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.

Organize this event for free with Lizzt

Organize for free and invite your contacts!