Factory open day checklist: what to arrange and when

A factory open day needs more than invitations and a clean reception area. Visitors must know where to go, tour groups need fixed times, and workstations must be safe before doors open. This checklist covers the planning sequence from publishing the date and processing registrations to printing visitor lists, setting up catering and checking access routes. Use it to avoid late changes to dietary information, missing name badges and unclear routes between the entrance, tour stations and refreshments.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Publish the date and opening hours

  • Send invitations

    2 people

  • Process registrations

  • Collect dietary requirements

  • Send visitor information

  • Set route maps

    2 people

  • Schedule tour guides

  • Make reservations

  • Place catering order

  • Prepare safety instructions

    2 people

  • Create a visitor map

  • Prepare name badges

    2 people

  • Confirm tour bookings

  • Print the visitor list

  • Do the shopping

    2 people

  • Chill drinks

    2 people

  • Setting up shelf-stable catering

    2 people

  • Check the access route

    2 people

  • Secure workstations

    3 people

  • Check the traffic route

    2 people

  • Set up tables and chairs

    4 people

  • Set up the reception desk

    2 people

  • Build the catering buffet

    3 people

  • Set up guided tour stations

    3 people

  • Set up signage

    3 people

  • Place safety signs

    2 people

  • Hang decorations

    2 people

  • Test sound system

    2 people

  • Set out presentation materials

    2 people

  • Prepare coffee and tea

    2 people

  • Prepare snacks

    3 people

  • Brief volunteers

    2 people

Event

  • Staff the reception desk

    2 people

  • Register visitors

    2 people

  • Welcome and give instructions

  • Guide tours

    4 people

  • Explain safety rules

    2 people

  • Guide demonstrations

    3 people

  • Lead presentations

    2 people

  • Serve coffee and tea

    2 people

  • Serve snacks

    2 people

  • Refill drinks

    2 people

  • Empty trash bins

    2 people

  • Check toilets

  • Answer visitor questions

    2 people

  • Guide the photo moment

  • Supervise the final tour

    3 people

  • Guide visitors to the exit

    2 people

Aftercare

  • Collect tableware

    3 people

  • Clean up catering

    3 people

  • Dismantle furniture

    4 people

  • Remove decorations

    2 people

  • Clear away equipment

    2 people

  • Dispose of waste

    2 people

  • Clean rooms

    4 people

  • Clean the restrooms

    2 people

  • Walk the grounds

    2 people

  • Return borrowed items

    2 people

  • Clear away leftover groceries

    2 people

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Tablesqty 10
  • Chairsqty 100
  • Bar stoolsqty 8
  • Reception desk
  • Buffet tablesqty 3
  • Waste binsqty 8

Equipment

  • Laptopsqty 2
  • Projector
  • Projection screen
  • Portable speakersqty 2
  • Wireless microphonesqty 2
  • Extension cordsqty 6
  • Power stripsqty 6
  • Coolersqty 4
  • Handheld megaphonesqty 2

Lighting

  • LED lampsqty 8
  • String lightsqty 4

Tableware

  • Coffee cupsqty 100
  • Glassesqty 150
  • Platesqty 120
  • Cutlery setsqty 120
  • Serving spoonsqty 8
  • Thermos flasksqty 6

Kitchen

  • Cutting boardsqty 4
  • Chef's knifeqty 4
  • Serving plattersqty 12
  • Serving traysqty 10
  • Cooling racksqty 4
  • Coffee machinesqty 3
  • Kettlesqty 3
  • Pitchersqty 8

Decorations

  • Buntingqty 8
  • Balloon archesqty 2
  • Tableclothsqty 12
  • Name badgesqty 120
  • Clipboardsqty 6
  • Pensqty 20
  • Photo backdrop
  • Decorative plantsqty 8

Safety

  • Safety helmetsqty 40
  • Safety gogglesqty 40
  • Ear defendersqty 40
  • Safety vestsqty 20
  • Bollardsqty 20
  • Barrier tapeqty 6
  • Safety signsqty 12
  • First aid kitqty 2
  • Non-slip matsqty 6

Information

  • Route signsqty 15
  • Program leafletsqty 150
  • Floor plansqty 150
  • Registration formsqty 150
  • Pen holdersqty 4

Cleaning

  • Broom setsqty 3
  • Mopsqty 6
  • Bucketsqty 4
  • Hand soap dispensersqty 6
  • Towel dispensersqty 6
  • Cleaning glovesqty 12
  • Litter pickersqty 2
  • Laundry basketsqty 4

Catering

  • Groceries

Tips

  • Set the date and opening hours before sending invitations, then allow at least 2–3 weeks to process registrations and collect dietary requirements. Send visitor information only after tour bookings and access details are confirmed.
  • Plan tour groups around the number of guides and available tour stations. Confirm bookings before printing the visitor list, and leave a small buffer between groups so one delayed tour does not affect the whole schedule.
  • Check the visitor route from the access road to reception and back at least one day before opening. Put route maps and signs where visitors must make a decision, not only at the entrance.
  • Complete the safety check before arranging tours or demonstrations. Secure workstations, check traffic routes and prepare safety instructions before tables, chairs and catering equipment block access.
  • Set up the reception desk, visitor list and name badges first on the day. Chill drinks and build the buffet close to opening time, while shelf-stable catering, coffee machines and signage can be prepared earlier.

Frequently asked questions

How far in advance should I plan a factory open day?
Start planning at least 4–6 weeks before the event. Publish the date and opening hours early, then use the following weeks for registrations, dietary requirements, tour bookings, catering and visitor information.
How do I organise guided factory tours?
Set fixed tour times and assign a guide to each group at least 1–2 weeks in advance. Confirm every booking before printing the visitor list, and keep a 10–15 minute gap between tours for late arrivals and movement through the site.
What should be ready before factory open day visitors arrive?
Reception, name badges, visitor lists, route signs, safety instructions and tour stations should be ready before opening. Finish the access and traffic-route check on the same day or the previous day, before visitors enter the site.
When should I order catering for a factory open day?
Place the catering order as soon as registrations and dietary requirements are stable, normally 7–10 days before the event. Chill drinks and assemble the buffet on the day, while shelf-stable items and serving equipment can be prepared earlier.