Open Art Day planning checklist

An Open Art Day combines exhibitions, workshops and demonstrations, so the practical details need to line up before visitors arrive. Confirm the artists and workshop leaders early, then arrange registration, promotion and dietary information. In the final week, check artwork dimensions, print labels and the floor plan, and prepare materials for each workshop. On the day itself, leave enough time for tables, exhibition panels, artworks, refreshments and a clear welcome point.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Set the date and program

    2 people

  • Confirm participating artists

    2 people

  • Plan workshops and demonstrations

    2 people

  • Reserve venue

  • Confirm workshop leaders

    2 people

  • Create the registration form

  • Send invitations

    2 people

  • Post promotion on social media

  • Hang posters

    2 people

  • Process registrations

  • Collect dietary requirements

  • Inventory artworks and dimensions

    2 people

  • Design exhibit labels

  • Print the program and floor plan

    2 people

  • Check the shopping list

    2 people

  • Do the shopping

    3 people

  • Pack artworks safely

    3 people

  • Set up materials per workshop

    3 people

  • Chill drinks

    2 people

  • Open venue

    2 people

  • Set up tables and chairs

    4 people

  • Set up exhibition panels

    4 people

  • Hang artworks

    4 people

  • Set up sculptures and ceramics

    3 people

  • Attach exhibit labels

    2 people

  • Set up workshop tables

    3 people

  • Distribute materials per workstation

    3 people

  • Set up the reception desk

    2 people

  • Prepare name badges and attendance list

  • Prepare coffee and tea

    2 people

  • Set up buffet and snacks

    3 people

  • Test lighting and music

    2 people

  • Check safe walking routes

    2 people

Event

  • Open doors for visitors

    2 people

  • Welcome visitors

    2 people

  • Register sign-ups

    2 people

  • Distribute program

  • Introduce the artists

  • Lead a tour

    2 people

  • Lead the painting workshop

    2 people

  • Assist the ceramics demonstration

    2 people

  • Guide the drawing demonstration

    2 people

  • Supervise children's activity

    3 people

  • Answer visitor questions

    2 people

  • Serve coffee and tea

    2 people

  • Serve snacks

    2 people

  • Refill drinks

  • Maintain the buffet

    2 people

  • Collect used dishes

    2 people

  • Replenish workshop materials

  • Clean work tables between uses

    2 people

  • Empty trash bins

  • Guide visitors to the exit

    2 people

  • Close sales records

    2 people

Aftercare

  • Dismantle artworks

    4 people

  • Dismantle exhibition panels

    3 people

  • Collect workshop materials

    3 people

  • Pack remaining catering

    2 people

  • Wash dishes

    3 people

  • Clear tables and chairs

    4 people

  • Clean the venue

    4 people

  • Dispose of waste

    2 people

  • Return artworks safely

    3 people

  • Return borrowed materials

    2 people

  • Store leftover materials

    2 people

  • Send thank-you message to participants

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Foldable tablesqty 10
  • Chairsqty 80
  • Reception desk
  • Stoolsqty 12
  • Display cubesqty 8
  • Coat racksqty 2
  • Waste binsqty 6
  • Table linenqty 10

Decorations

  • Display panelsqty 12
  • Easelsqty 10
  • Wall hooksqty 40
  • Picture hanging wiresqty 20
  • Exhibition labelsqty 40
  • Welcome sign
  • Program standsqty 4
  • Flagsqty 3
  • Flower arrangementsqty 4
  • Name badgesqty 50

Tableware

  • Coffee cupsqty 80
  • Glassesqty 100
  • Platesqty 100
  • Forksqty 100
  • Knivesqty 100
  • Spoonsqty 100
  • Serving boardsqty 6
  • Small bowlsqty 12
  • Carafesqty 8

Equipment

  • Coffee machinesqty 2
  • Kettlesqty 2
  • Coolersqty 4
  • Bluetooth speakersqty 2
  • Extension cordsqty 6
  • Power stripsqty 6
  • Glue gunsqty 6
  • Cutting matsqty 10
  • Apronsqty 20
  • Work glovesqty 10
  • Platform trolleysqty 2

Kitchen

  • Measuring cupsqty 4
  • Cutting boardsqty 4
  • Chef's knivesqty 4
  • Serving tongsqty 8
  • Serving spoonsqty 6
  • Food containersqty 12

Lighting

  • LED spotlightsqty 8
  • Atmosphere lightsqty 8
  • Batteriesqty 24

Cleaning

  • Broomqty 2
  • Dustpan and brushqty 2
  • Mop setsqty 2
  • Bucketsqty 4
  • Cleaning spraysqty 4
  • Microfiber clothsqty 20
  • Toilet brushesqty 2

Catering

  • Groceries

Tips

  • Set the date only after checking artist and workshop-leader availability. Keep the programme detailed enough to show workshop times, demonstrations and any registration limits.
  • Complete the registration process before finalising refreshments. Collect dietary requirements with the registration form and use the final numbers to plan cups, glasses, plates and drinks.
  • Measure every artwork, sculpture and ceramic piece before designing exhibition labels. A last-minute size change can affect panel placement, display cubes, easels and the printed floor plan.
  • Pack artworks safely and group workshop materials by session rather than by item type. This makes it faster to set up each table and reduces the chance of missing a small bowl, tool or demonstration supply.
  • Reserve a dedicated setup period before opening the venue. Allow time for tables and chairs, exhibition panels, hanging wires and labels, then chill drinks and place the programme where visitors can see it.

Frequently asked questions

How far in advance should I organise an Open Art Day?
Start at least 8 to 12 weeks ahead. Use the first few weeks to confirm the date, venue, artists, workshop leaders and programme, then open registration and begin promotion.
When should I send Open Art Day invitations?
Send the first invitations about 4 to 6 weeks before the event. Post reminders on social media and refresh posters during the final 10 to 14 days, when people are deciding their weekend plans.
How long does Open Art Day setup take?
Allow at least 3 to 4 hours for setup, and longer if many artworks need hanging. Set up furniture first, then panels and display pieces, followed by artworks, labels, workshop materials and refreshments.
When should I print the Open Art Day programme and floor plan?
Print them 2 to 3 days before opening, after registrations, artwork dimensions and workshop details are final. Keep a small spare stack at reception in case the programme changes or more visitors attend than expected.