How to organise an animation workshop
An animation workshop runs smoothly when the creative work is planned around the room, equipment and participant flow. Start by confirming the venue and registrations, then match the number of workstations to the final participant list. Test the projector, sound, laptops, tablets and power connections before the day, and prepare each table with its materials in advance. Leave enough time for registration, refreshments and a clear introduction before showing animation examples.
The plan, step by step
Every task with its own sub-checklist, in the order you'll actually need them.
Preparations
- 1
Confirm the workshop venue
- 2
Send invitations
- 3
Process registrations
- 4
Collect dietary requirements
- 5
Update participant list
- 6
Send program to attendees
- 7
Check supplies
2 people
- 8
Test the equipment
2 people
- 9
Do the shopping
2 people
- 10
Sort materials
2 people
- 11
Print handouts
- 12
Make name badges
- 13
Chill drinks
- 14
Open venue
2 people
- 15
Set up tables
3 people
- 16
Set out chairs
2 people
- 17
Connect projection and sound
2 people
- 18
Set up workstations
3 people
- 19
Distribute materials per table
3 people
- 20
Set up the reception desk
Event
- 21
Receive participants
2 people
- 22
Register attendance
- 23
Serve coffee and tea
2 people
- 24
Explain the workshop program
- 25
Show animation examples
- 26
Explain the storyboard assignment
- 27
Guide storyboard assignment
2 people
- 28
Serve break snacks
2 people
- 29
Refill drinks
- 30
Record animations
3 people
- 31
Edit animations
3 people
- 32
Set up the buffet
2 people
- 33
Serve dinner
3 people
- 34
Present final results
2 people
- 35
Thank participants
- 36
See participants off
2 people
Aftercare
- 37
Collect waste
2 people
- 38
Wash dishes
2 people
- 39
Switch off equipment
2 people
- 40
Clean work tables
2 people
- 41
Pack up materials
3 people
- 42
Reset the room
3 people
- 43
Clean the floor
- 44
Chill leftover food
- 45
Return borrowed items
- 46
Send participant files
- 47
Leave the venue tidy
What to bring
Grouped the way you'd shop for it, with quantities.
Furniture
- Tablesqty 6
- Chairsqty 24
- Tableclothqty 6
Equipment
- Laptopsqty 6
- Tabletsqty 6
- Projector
- Projection screen
- HDMI cablesqty 3
- Power stripsqty 6
- Extension cordsqty 6
- Headphonesqty 12
- Tripodsqty 6
- LED lightsqty 6
- USB sticksqty 6
Kitchen
- Kettleqty 2
- Coffee maker
- Coolersqty 2
Tableware
- Coffee cupsqty 24
- Drinking glassesqty 30
- Platesqty 30
- Cutlery setsqty 30
- Serving plattersqty 6
- Serving spoonsqty 6
Decorations
- Name badge holdersqty 24
- Arrow signsqty 6
- Presentation board
Lighting
- Atmosphere lightsqty 4
Cleaning
- Waste binsqty 3
- Vacuum cleaner
- Mop set
- Cleaning bucket
- Microfiber clothsqty 8
Workshop materials
- Drawing paperqty 200
- Storyboard sheetsqty 30
- Sketchbooksqty 24
- Pencil setsqty 24
- Colored pencil setsqty 12
- Markersqty 12
- Finelinersqty 24
- Erasersqty 24
- Pencil sharpenersqty 12
- Scissorsqty 24
- Glue sticksqty 24
- Rolls of tapeqty 12
- Poster puttyqty 6
- Clayqty 12
- Backdrop cardboardqty 30
- Craft cardboardqty 100
- Rulersqty 12
- Whiteboard
- Whiteboard markersqty 6
- Flip chart
- Flip chart sheetsqty 30
- Work foldersqty 24
- Pen setsqty 24
Catering
- Groceries
Tips
- Confirm the final participant list at least 3 days before the workshop. Use it to check dietary requirements, prepare name badges and decide how many tables, chairs and workstations are needed.
- Test the projector, projection screen, HDMI cables, sound, laptops and tablets at the venue at least 1 day beforehand. Bring spare power strips and extension cords, and check that every workstation can be powered safely.
- Prepare one complete materials set per table before participants arrive. Sort the materials, print the handouts and place headphones, tripods, LED lights or other equipment where participants can reach them without interrupting the workshop.
- Plan the first 30 minutes as a fixed arrival sequence: open the venue, set up the reception desk, register attendance, serve coffee and tea, then explain the programme. This prevents late arrivals from disrupting the first exercise.
- Open the venue at least 90 minutes before the advertised start time. Set up tables and chairs first, then workstations and projection, and keep 15 minutes at the end for a final equipment and materials check.
Frequently asked questions
- How far in advance should I plan an animation workshop?
- Start planning at least 4 weeks ahead. Confirm the venue and send invitations first, then close registrations or review the participant list about 3 days before the workshop so you can prepare equipment, handouts and dietary information.
- How long does it take to set up an animation workshop?
- Allow at least 90 minutes for setup on the day. Reserve the final 15 minutes for testing the projector and sound, checking power connections and confirming that every table has its materials.
- How many animation workstations do I need?
- Prepare one workstation for each participant who will work independently. If participants work in pairs, plan one laptop or tablet per two people and add at least 10 minutes before the workshop to explain how equipment will be shared.
- What should I test before an animation workshop?
- Test the projector, screen, HDMI connection, sound, laptops or tablets and headphones at least 1 day before the workshop. On the day itself, repeat a short 15-minute check after everything is connected, because cables and power strips are often moved during setup.
Plans a lot like this one
Start this plan in Lizzt
Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.
Organize this event for free with LizztOrganize for free and invite your contacts!