How to organise a gravel tour without missing the details
Organising a gravel tour starts with a confirmed route, a realistic participant limit and enough time for permits and safety checks. Once the date and start location are fixed, open registration and publish the route file so you can plan volunteers, food and equipment from actual numbers. The final week is for riding the route again, checking the forecast and preparing signage. On the day itself, separate arrival, riding and support logistics so one delay does not disrupt the whole event.
The plan, step by step
Every task with its own sub-checklist, in the order you'll actually need them.
Preparations
- 1
Record date and route
2 people
- 2
Reserve starting location
- 3
Check permits
- 4
Check route for traffic risks
2 people
- 5
Send invitations
- 6
Open the registration form
- 7
Publish route file
- 8
Process registrations
- 9
Collect dietary requirements
- 10
Assign volunteers
- 11
Send participant information
- 12
Check the weather forecast
- 13
Ride the route again
2 people
- 14
Print route files and maps
- 15
Do the shopping
2 people
- 16
Check bikes and tools
2 people
- 17
Prepare race numbers
2 people
- 18
Sort route arrows
2 people
- 19
Fill coolers
2 people
- 20
Print Participants' Phone Numbers
- 21
Mark out the starting area
4 people
- 22
Mark route
4 people
- 23
Set up supply point
3 people
- 24
Set up the bicycle parking
2 people
- 25
Build party tents
4 people
- 26
Set up tables and chairs
3 people
- 27
Set up reception desk
2 people
- 28
Chill food and drinks
2 people
- 29
Prepare coffee and tea
2 people
Event
- 30
Register participants
3 people
- 31
Hand out race numbers
2 people
- 32
Give Cycling and Route Briefing
2 people
- 33
Lead the group start
3 people
- 34
Carry out a route check
3 people
- 35
Staff the supply point
3 people
- 36
Refill drinks
2 people
- 37
Restock fruit and snacks
2 people
- 38
Provide roadside assistance
2 people
- 39
Keep track of finish times
2 people
- 40
Serve finisher drinks
2 people
- 41
Serve soup and bread
3 people
- 42
Turn on lighting
- 43
Receive the last participants
2 people
Aftercare
- 44
Remove route arrows
4 people
- 45
Dismantle the start area
4 people
- 46
Wash dishes
2 people
- 47
Collect waste
3 people
- 48
Clean the grounds
3 people
- 49
Inventory materials
2 people
- 50
Return borrowed materials
2 people
- 51
Complete route check
2 people
- 52
Process lost and found items
- 53
Send a thank-you gift to participants
What to bring
Grouped the way you'd shop for it, with quantities.
Furniture
- Party tentsqty 2
- Foldable tablesqty 8
- Folding chairsqty 40
- Bicycle racksqty 6
- Waste binsqty 6
Equipment
- Coolersqty 6
- Kettlesqty 2
- Coffee machinesqty 2
- Thermos flasksqty 6
- Power banksqty 6
- Walkie-talkiesqty 8
- Mobile phone chargersqty 4
Sports equipment
- Route arrowsqty 120
- Conesqty 30
- Bib numbersqty 80
- Bib holdersqty 80
- Spare bike pumpsqty 4
- Bike tool kitsqty 4
- Spare inner tubesqty 20
- Tire leversqty 12
- Bicycle trailersqty 2
Lighting
- LED lampsqty 8
- Headlampsqty 10
- Extension cordsqty 4
Tableware
- Reusable cupsqty 120
- Reusable bowlsqty 80
- Reusable cutleryqty 100
- Serving spoonsqty 4
Kitchen
- Soup kettlesqty 2
- Cutting boardsqty 4
- Bread knivesqty 3
- Measuring cupsqty 2
- Ice packsqty 24
- Cratesqty 12
Cleaning
- Hand soapqty 4
- Disinfectant gelqty 4
- First aid kitsqty 3
- Litter pickersqty 4
Catering
- Groceries
Tips
- Fix the date, route and starting location before opening registration. Check permits and traffic risks at least 6–8 weeks ahead, because a route change late in the process affects maps, arrows, volunteers and participant information.
- Set a registration deadline 7–10 days before the ride. Use the final list to assign volunteers, collect dietary requirements, print bib numbers and phone lists, and estimate food and drink quantities instead of guessing.
- Ride the full route again during the final week, ideally in conditions similar to event day. Check crossings, loose surfaces, unclear turns and the exact position of the supply point; a route that looks clear on a file may not be clear from a bike.
- Prepare the start and support areas in separate batches the day before. Put route arrows, cones, bib holders, tools, pumps, spare inner tubes and power banks together so volunteers are not searching through boxes during registration.
- Plan for an early finish to setup: allow at least 2 hours before the first riders arrive to mark the starting area, route and bicycle parking, build the party tents, fill coolers and test lighting, radios and charging equipment.
Frequently asked questions
- How far in advance should I organise a gravel tour?
- Start planning 8–12 weeks before the ride. That gives you time to confirm the route and location, check permits, open registration, recruit volunteers and adjust the plan after checking the route again.
- When should I publish the gravel tour route?
- Publish the route file as soon as the main route is confirmed, usually 3–4 weeks before the event. Send any final changes with the participant information 3–5 days before the ride, after the last route check.
- How many volunteers do I need for a gravel tour?
- Plan at least 1 volunteer for registration and the start, 1 for each supply point, and 1 route or safety contact for every 30–50 riders. Add a coordinator and a backup for each critical position at least 7 days before the event.
- When should I check the weather and prepare the equipment?
- Check the forecast 5–7 days before the ride and again the evening before. Sort arrows, bibs, tools, coolers and shelter equipment the day before, then allow 2 hours on event morning for setup and testing.
Plans a lot like this one
Start this plan in Lizzt
Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.
Organize this event for free with LizztOrganize for free and invite your contacts!