Barista workshop checklist: what to arrange and when

A barista workshop needs more than coffee and an espresso machine. You need a clear participant list, suitable beans, working equipment, enough power and a setup that lets everyone practise without waiting. Start with the date, venue and registrations, then confirm dietary needs and workshop supplies. In the final 24 hours, grind only what the session requires, chill refrigerated items and prepare badges and workstations. Use the full checklist to keep preparation in the right order.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Confirm date and location

  • Send invitations

  • Open registrations

  • Process registrations

  • Collect dietary requirements

  • Update participant list

  • Send confirmation to participants

  • Select coffee beans

  • Order catering

  • Check the equipment

    2 people

  • Confirm reservations

  • Set up workstations

    2 people

  • Do the shopping

    2 people

  • Grind coffee beans

  • Chill refrigerated items

  • Print participant badges

Event

  • Open venue

    2 people

  • Set up tables and chairs

    3 people

  • Set up workstations

    3 people

  • Connect equipment

    2 people

  • Set out coffee and milk

    2 people

  • Receive participants

    2 people

  • Serve coffee and tea

    2 people

  • Explain the workshop program

  • Demonstrate espresso

  • Explain the grind settings

  • Have participants make espresso

    3 people

  • Demonstrate frothing milk

  • Have cappuccino prepared

    3 people

  • Practice latte art

    3 people

  • Guide the coffee tasting

    2 people

  • Serve snacks

    2 people

  • Refill drinks

  • Clean the workstations in between

    2 people

  • Moderate the Q&A

  • See participants off

    2 people

Aftercare

  • Switch off equipment

    2 people

  • Wash dishes

    2 people

  • Clean coffee machines

    2 people

  • Dismantle workstations

    3 people

  • Put tables and chairs back

    3 people

  • Collect waste

    2 people

  • Clean the venue

    2 people

  • Pack up materials

    2 people

  • Lock up the venue

  • Return borrowed items

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Tablesqty 8
  • Chairsqty 24
  • Buffet table
  • Coat racksqty 2

Equipment

  • Espresso machinesqty 5
  • Coffee grindersqty 5
  • Kettlesqty 5
  • Digital scalesqty 5
  • Coffee timersqty 5
  • Coffee setsqty 5
  • Power stripsqty 6
  • Extension cordsqty 6
  • Water containersqty 5
  • Coolersqty 2

Kitchen

  • Milk jugsqty 10
  • Thermometersqty 5
  • Tampersqty 5
  • Knockout traysqty 5
  • Measuring cupsqty 5
  • Serving Cupsqty 5
  • Serving traysqty 4
  • Cutting boardsqty 2

Tableware

  • Coffee cupsqty 30
  • Tasting cupsqty 100
  • Water glassesqty 30
  • Teaspoonsqty 30
  • Cake platesqty 30
  • Serving tongsqty 4

Cleaning

  • Washing-up bowlsqty 3
  • Microfiber clothsqty 12
  • Dish brushesqty 4
  • Floor squeegee

Catering

  • Groceries

Tips

  • Confirm the venue and reservations before opening registration. Check how many workstations fit, where tables and chairs can go, and whether the available power supports the espresso machines, grinders and kettles.
  • Close the registration list early enough to buy and prepare accurately. Collect dietary requirements with each registration, then send a confirmation so participants know when and where to arrive.
  • Test every espresso machine, grinder, kettle, scale and timer before the workshop starts. Do not leave power strips, extension cords, water containers or cleaning supplies until setup; missing small items can stop a whole workstation.
  • Set up one complete workstation before arranging the rest. Include the machine, grinder, tamper, knockout tray, scale, timer, cups, milk jug and cloth so you can spot missing equipment before participants arrive.
  • Allow time for both demonstration and service. Have coffee, milk, water, tea and catering ready before explaining the programme, and keep spare cups, tasting cups and washing-up bowls available throughout the session.

Frequently asked questions

How far in advance should I open registration for a barista workshop?
Open registration at least 2 to 4 weeks before the workshop. Close it several days in advance so you can update the participant list, collect dietary requirements and prepare badges, coffee and catering quantities.
How much coffee do I need for a barista workshop?
Base the amount on the number of participants, planned tastings and demonstrations, then add a 10–15% reserve. Keep the final quantity aligned with the number of espresso machines and workstations so the session does not run out during practice.
When should I check the barista workshop equipment?
Do a full equipment check 1 to 3 days before the workshop, then test the connected machines again on the day. Confirm water, power, grinders, scales, timers, tampers, cups and cleaning materials before participants arrive.
How long before the workshop should I set up the workstations?
Start the room setup at least 60–90 minutes before the first participant arrives. Connect and test the equipment first, then place coffee, milk, cups and other serving items so the demonstration can begin on time.

Start this plan in Lizzt

Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.

Organize this event for free with Lizzt

Organize for free and invite your contacts!