Art exhibition checklist: what to arrange and when
An art exhibition depends on more than hanging the work. You need a confirmed date and venue, reliable artist and transport arrangements, accurate artwork records, and a floor plan that works for visitors. This checklist takes you from the first decisions through invitations, catering, labels, lighting, and opening-day setup. It also covers details that are often left too late, such as insurance checks, dietary requirements, condition checks, and clear signage.
The plan, step by step
Every task with its own sub-checklist, in the order you'll actually need them.
Preparations
Confirm exhibition date
Reserve venue
Set opening hours
Confirm artists
Inventory artworks
2 people
Make transport arrangements
2 people
Check insurance details
Create exhibition map
2 people
Collect artist biographies
Collect job descriptions
Design invitations
Send invitations
2 people
Process registrations
Collect dietary requirements
Book catering
Order drinks and snacks
Publish promotion
Prepare name badges
Print work labels
Prepare signage
Collect the artworks
2 people
Do the shopping
2 people
Unpack artwork
3 people
Condition artworks
2 people
Clean the venue
2 people
Set up tables and chairs
3 people
Set up walls and panels
3 people
Hang artworks
3 people
Position sculptures
2 people
Attach work labels
2 people
Adjust the lighting
2 people
Set up the entrance
2 people
Set up the registration table
2 people
Set up the catering table
2 people
Chill drinks
2 people
Prepare snacks
2 people
Test sound system
2 people
Brief the opening team
3 people
Event
Open the doors
2 people
Register visitors
2 people
Welcome visitors
2 people
Welcome the artists
Give the opening speech
Lead a tour
2 people
Serve snacks
2 people
Refill drinks
2 people
Collect waste
Answer visitor questions
2 people
Provide sales information
See off the last visitors
2 people
Aftercare
Secure artworks
3 people
Clean up catering
2 people
Wash dishes
2 people
Dismantle furniture
3 people
Dismantle exhibition materials
3 people
Clean the venue
2 people
Return artwork
2 people
Return materials
2 people
Return borrowed equipment
2 people
Collect lost property
What to bring
Grouped the way you'd shop for it, with quantities.
Furniture
- Tablesqty 6
- Chairsqty 30
- High tablesqty 4
- Exhibition panelsqty 8
- Pedestalsqty 6
- Coat racksqty 2
Equipment
- Laptopsqty 2
- Tabletsqty 2
- Sound system
- Microphonesqty 2
- Extension cordsqty 6
- Power stripsqty 6
- Payment terminal
- Power banksqty 4
- Measuring tapeqty 2
- Spirit levelsqty 2
- Cordless drill driversqty 2
- Screwdriver setsqty 2
- Hammersqty 2
- Laddersqty 2
- Glovesqty 8
- Ratchet strapsqty 8
- Transport blanketsqty 12
- Hand trucksqty 2
Lighting
- Art spotlightsqty 10
- Standing lampsqty 4
Tableware
- Glassesqty 80
- Coffee cupsqty 40
- Platesqty 60
- Cutlery setsqty 60
- Serving plattersqty 8
- Serving tongsqty 6
Kitchen
- Coffee machinesqty 2
- Kettlesqty 2
- Coolersqty 4
- Thermos flasksqty 4
- Cutting boardsqty 2
- Knivesqty 4
- Waste binsqty 4
Decorations
- Tableclothsqty 8
- Plantsqty 10
- Photo framesqty 4
- Name badge holdersqty 20
- Clipboardsqty 4
- Decorative potsqty 6
- Name badgesqty 20
- Program flyersqty 100
- Signage boardsqty 8
- Guest book
- Pensqty 12
- Cable matsqty 8
Cleaning
- Vacuum cleaner
- Mopsqty 2
- Bucketsqty 2
- Cleaning clothsqty 12
- Toilet brushesqty 2
- Hand broomsqty 2
- Dustpansqty 2
Catering
- Groceries
Tips
- Confirm the venue, exhibition date, opening hours, and a backup option before inviting artists or publishing anything. Build in enough access time for cleaning, unloading, lighting, and artwork installation.
- Create one inventory for every artwork, including its artist, title, dimensions, condition, label text, and transport plan. Agree pickup and return times early; last-minute transport is difficult to coordinate around installation.
- Finish the floor plan before ordering or positioning exhibition panels, plinths, tables, chairs, and high tables. Mark power points and viewing routes so extension cords, power strips, spotlights, and lamps do not create trip hazards.
- Send invitations only after the artist list, opening details, registration process, and catering plan are settled. Collect dietary requirements with registrations and order drinks and snacks against the expected attendance rather than guessing at the last minute.
- Reserve the final setup window for cleaning, unpacking, conditioning, and checking the artwork, then add labels, name badges, directions, and plants or photo frames. Test laptops, tablets, microphones, sound equipment, coffee machines, kettles, and lighting before guests arrive.
Frequently asked questions
- How far in advance should I plan an art exhibition?
- Start at least 8 to 12 weeks before the opening. Use the first weeks for the venue, date, artists, insurance, artwork inventory, and transport; leave the final 1 to 2 weeks for invitations, labels, catering, and promotion.
- When should I confirm the artists for an exhibition?
- Confirm artists 6 to 8 weeks before opening, before you publish the exhibition or print invitations. Collect biographies, artwork details, installation requirements, and transport responsibilities at the same time.
- How early should artwork arrive before an exhibition opening?
- Arrange delivery or collection at least 1 to 3 days before the opening. That gives you time to clean the venue, unpack and condition the work, install it, print or place labels, and resolve damage or missing-item issues.
- How much time do I need to set up an art exhibition?
- Allow at least 6 to 10 hours for a small exhibition, and longer if you are using panels, plinths, complex lighting, or audiovisual equipment. Schedule cleaning first, then furniture and lighting, followed by artwork, labels, signage, and a full technical test.
Plans a lot like this one
Start this plan in Lizzt
Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.
Organize this event for free with LizztOrganize for free and invite your contacts!