Together Play Day checklist: what to arrange and when

Together Play Day combines performances, participating associations, musicians, visitors, and a shared venue. The work is easiest when you fix the date and programme first, then confirm the venue, permissions, performers, registrations, and technical needs. Allow time to collect dietary requirements and performance timings before printing the programme. On the day itself, plan separate time for the stage, sound, lighting, seating, tables, decorations, and volunteer briefing so setup does not compete with the opening time.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Set the date and program

    2 people

  • Contact participating associations

    2 people

  • Collect performances and times

    2 people

  • Reserve venue

  • Check permits

  • Check insurance

  • Send invitations

    2 people

  • Process registrations

    2 people

  • Collect dietary requirements

  • Compile musician list

    2 people

  • Work out the stage layout

    2 people

  • Gather technical requirements

    2 people

  • Print the program

    2 people

  • Check the shopping list

    2 people

  • Do the shopping

    3 people

  • Collect materials

    2 people

  • Store musical instruments safely

    3 people

  • Brief volunteers

    2 people

  • Open venue

    2 people

  • Build the stage and playing area

    6 people

  • Set up tables

    4 people

  • Set out chairs

    4 people

  • Hang up decorations

    3 people

  • Connect sound equipment

    3 people

  • Connect lighting

    2 people

  • Set up instruments

    4 people

  • Set up music stands

    3 people

  • Set up the catering area

    3 people

  • Chill drinks

    2 people

  • Prepare snacks

    4 people

  • Set up registration desk

    2 people

  • Lay out the programs

  • Perform sound check

    3 people

Event

  • Receiving performing groups

    3 people

  • Welcome visitors

    3 people

  • Explain the program

  • Guide the opening act

    3 people

  • Guide the performances

    3 people

  • Swap instruments

    4 people

  • Moving microphones

    2 people

  • Serve snacks

    4 people

  • Serve drinks

    3 people

  • Refill drinks

    2 people

  • Provide coffee and tea

    2 people

  • Empty trash bins

    2 people

  • Check toilets

  • Play break music

  • Assist the joint closing performance

    4 people

  • Give a thank-you speech

  • Wave goodbye to visitors

    3 people

Aftercare

  • Turn off the sound equipment

    3 people

  • Pack instruments

    4 people

  • Collect tableware

    3 people

  • Clean up catering

    4 people

  • Dismantle furniture

    5 people

  • Remove decorations

    3 people

  • Clean the venue

    5 people

  • Dispose of waste

    2 people

  • Return materials

    2 people

  • Return borrowed instruments

    2 people

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Tablesqty 12
  • Chairsqty 180
  • Bar stoolsqty 8
  • Clothes racksqty 2
  • Stage sectionsqty 12
  • Music standsqty 45
  • Stools for musiciansqty 20
  • Bollardsqty 8

Equipment

  • Mixing console
  • Speakersqty 4
  • Stage monitorsqty 2
  • Microphonesqty 8
  • Microphone standsqty 8
  • DI boxesqty 4
  • Audio cablesqty 15
  • Extension cordsqty 10
  • Power stripsqty 8
  • Cable matsqty 12
  • Laptop
  • Music stand lightsqty 12

Lighting

  • Light setsqty 2
  • Mood lightingqty 8
  • LED lampsqty 12

Tableware

  • Glassesqty 220
  • Coffee cupsqty 120
  • Platesqty 220
  • Forksqty 220
  • Knivesqty 220
  • Spoonsqty 160
  • Serving spoonsqty 10
  • Serving traysqty 12

Kitchen

  • Coffee machinesqty 2
  • Kettlesqty 2
  • Hot drink urnsqty 6
  • Thermos flasksqty 4
  • Coolersqty 6
  • Cutting boardsqty 4
  • Chef's knifeqty 4
  • Serving tongsqty 8
  • Bowlsqty 16
  • Measuring cupsqty 2

Catering

  • Cash drawer
  • Payment terminal
  • Menu boardsqty 6
  • Name badgesqty 60
  • Herb tablesqty 2
  • Groceries

Decorations

  • Buntingqty 8
  • Tableclothsqty 12
  • Flower arrangementsqty 8
  • Balloonsqty 100
  • Decorative music notesqty 20
  • Tapeqty 6
  • Cable tiesqty 100
  • Scissorsqty 4

Cleaning

  • Waste binsqty 8
  • Vacuum cleaner
  • Mopsqty 3
  • Bucketsqty 3
  • Broomqty 2
  • Dustpan and brushqty 2
  • Cleaning glovesqty 6
  • Toilet brushesqty 4

Sports equipment

  • Conesqty 12
  • Practice ballsqty 20
  • Skipping ropesqty 10
  • Game cardsqty 4

Tips

  • Start with the date, programme, and participating associations. Ask each group for its performance, running time, technical requirements, and final musician list before you publish the programme.
  • Reserve the venue before sending invitations, then check permits and insurance early. A missing approval can affect the programme, capacity, or whether you can use sound and lighting equipment.
  • Collect registrations together with dietary requirements and a clear deadline. Use the final number of attendees to check tables, chairs, glasses, cups, plates, and cutlery before shopping.
  • Create the stage and sound plan before event day. Match microphones, stands, DI boxes, monitors, speakers, cables, power strips, extension cords, and cable mats to each performance, rather than discovering gaps during setup.
  • Set a written setup schedule with named volunteers. Open the venue early enough to build the stage and playing area, arrange seating and tables, connect sound and lighting, store instruments safely, and complete a full equipment check before guests arrive.

Frequently asked questions

How far in advance should I start planning Together Play Day?
Start at least 8 to 12 weeks before the event. Fix the date, programme, venue, participating associations, permits, and insurance first; leave the final 2 weeks for registrations, shopping, printing, and volunteer instructions.
When should performers submit their timings and technical requirements?
Set a deadline 4 to 6 weeks before Together Play Day. You need the information to build the stage layout, compile the musician list, plan microphones and connections, and print an accurate programme.
How early should volunteers arrive on Together Play Day?
Schedule volunteers at least 3 hours before guests arrive when you need to build the stage, arrange tables and chairs, connect sound and lighting, and hang decorations. Add more time if the venue is unfamiliar or several groups perform.
When should I print the Together Play Day programme?
Print the programme during the final week, after performance times and registrations are confirmed. Keep a small buffer of 2 to 3 days for corrections or a late change from a participating association.

Start this plan in Lizzt

Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.

Organize this event for free with Lizzt

Organize for free and invite your contacts!