Open studio day checklist
An open studio day combines an exhibition, working demonstrations and hands-on workshops, so the visitor flow needs planning before you set up the room. Confirm the artists, opening hours and programme first, then match each workshop with a workspace, materials and equipment. In the final week, focus on registrations, dietary requirements, artwork labels and signs. On the day itself, allow time for tables, exhibition walls, lighting, refreshments and a full safety check before visitors arrive.
The plan, step by step
Every task with its own sub-checklist, in the order you'll actually need them.
Preparations
Confirm the date and opening hours
Confirm participating artists
Create workshop layout
Plan the program and demonstrations
2 people
Design invitations
Send invitations
Publish event online
Process registrations
Collect dietary requirements
Create visitor list and badges
Inventory artworks and demonstrations
2 people
Assign workspaces per workshop
Set up materials per workshop
2 people
Check the shopping list
Do the shopping
2 people
Chill drinks
Label artworks
2 people
Make route and safety signs
Test the sound and lighting
2 people
Clean the venue
2 people
Set up tables and chairs
3 people
Cover work tables
2 people
Set up exhibition walls
3 people
Display artworks
3 people
Distribute creative materials
2 people
Set up the reception table
2 people
Set up coffee and drinks station
2 people
Arrange snacks on platters
2 people
Set out name stickers and program cards
Give participant briefing
Event
Open the doors and welcome visitors
2 people
Check off registrations
Direct visitors to the studios
2 people
Supervise open workspaces
3 people
Provide artist demonstrations
4 people
Lead the workshops
3 people
Serve coffee and tea
2 people
Refill snacks
2 people
Refill drinks
Clear work tables in between
2 people
Empty trash bins
Inform visitors about the closure
Aftercare
Pack artworks safely
3 people
Wash dishes and supplies
2 people
Take down tables and chairs
3 people
Remove decorations and signage
2 people
Thoroughly clean the workshops
3 people
Count and store materials
2 people
Store leftover food
Dispose of waste separately
2 people
Return borrowed items
2 people
Hand over the venue
What to bring
Grouped the way you'd shop for it, with quantities.
Furniture
- Tablesqty 10
- Chairsqty 60
- Stoolsqty 20
- Exhibition wallsqty 8
- Easelsqty 12
- Clothes racksqty 2
Tableware
- Reusable cupsqty 80
- Platesqty 70
- Cutlery setsqty 70
- Coffee cupsqty 50
- Serving plattersqty 12
- Pitchersqty 6
Decorations
- Tableclothsqty 10
- Name badgesqty 80
- Program cardsqty 80
- Sticky tackqty 6
- Adhesive tapeqty 8
- Directional signsqty 12
Equipment
- Coffee machinesqty 2
- Kettlesqty 2
- Coolersqty 4
- Extension cordsqty 8
- Power stripsqty 6
- Cable matsqty 8
Lighting
- Work lightsqty 8
Kitchen
- Cutting boardsqty 4
- Knivesqty 6
- Scissorsqty 12
- Water jugsqty 6
- Thermos flasksqty 4
- Washing-up bowlsqty 3
Art supplies
- Sketchbooksqty 30
- Drawing paperqty 300
- Pencilsqty 60
- Colored pencilsqty 60
- Markersqty 60
- Acrylic paintqty 12
- Brushesqty 40
- Palletsqty 20
- Mixing bowlsqty 30
- Water bowlsqty 20
- Protective apronsqty 30
- Nitrile glovesqty 100
- Protective filmqty 4
- Drying racksqty 4
- Labelsqty 100
Cleaning
- Bucketsqty 4
- Mopsqty 4
- Hand broomsqty 3
- Dustpan and brushqty 3
- Spongesqty 10
Catering
- Groceries
Tips
- Set the programme before sending invitations. Include demonstration times, workshop capacity and registration details so visitors know whether they can drop in or need a place.
- Assign every workshop a defined workspace and prepare its materials together. This prevents scissors, cutting boards, knives or other shared equipment from being moved between sessions.
- Plan the visitor route before displaying artwork. Use directional signs at entrances, crossings and workshop areas, and keep cables covered with cable mats rather than relying on people to notice them.
- Test sound, lighting and power at least one day before opening. Check extension cords and power strips under the actual load, especially where coffee machines, kettles or work lights share a circuit.
- Chill drinks and prepare serving equipment on the morning of the event, not during opening. Put out reusable cups, pitchers and water jugs before the first visitors arrive, and keep a separate list for dietary requirements.
Frequently asked questions
- How far in advance should I plan an open studio day?
- Start at least 6–8 weeks ahead if several artists or workshops are involved. Use the first weeks to confirm the date, artists, programme and opening hours; leave the final week for registrations, shopping, labels and signage.
- What should I prepare the day before an open studio day?
- Set up or mark the tables, chairs, exhibition walls and workshop areas, then test lighting and sound. Also label the artworks, prepare badges and programme cards, check materials against the shopping list and refrigerate drinks if possible.
- How many workshop places should I offer?
- Set the number from the available workspaces rather than the expected crowd. Leave enough room for each participant to work safely and keep at least one clear route through the room; confirm the final capacity before processing registrations.
- When should I set up refreshments for an open studio day?
- Prepare cups, plates, cutlery, pitchers and serving areas before doors open, ideally 30–60 minutes in advance. Chill drinks early enough that they are cold at opening, and keep dietary information with the visitor list.
Plans a lot like this one
Start this plan in Lizzt
Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.
Organize this event for free with LizztOrganize for free and invite your contacts!