How to organise an open stage without last-minute chaos
An open stage works best when performer registrations, the running order and the technical setup are handled in that order. Start by confirming the date and venue, then recruit performers and collect the details needed for each act. Build a provisional schedule before publishing the programme, leaving time for changeovers and a soundcheck. On the day, keep one person responsible for the stage, one for the host and one for performer check-in.
The plan, step by step
Every task with its own sub-checklist, in the order you'll actually need them.
Preparations
- 1
Confirm date and location
- 2
Open the registration form
- 3
Send invitations
2 people
- 4
Recruit performers
2 people
- 5
Process registrations
- 6
Tentatively schedule performances
2 people
- 7
Collect dietary requirements
- 8
Make reservations
- 9
Check permits
- 10
Coordinate technical setup
2 people
- 11
Confirm host
- 12
Assign volunteers
2 people
- 13
Finalize the performance schedule
2 people
- 14
Publish the program
- 15
Send performer information
- 16
Check the shopping list
- 17
Do the shopping
2 people
- 18
Collect materials
2 people
- 19
Check groceries
2 people
- 20
Chill drinks
2 people
- 21
Print the program and run sheet
Event
- 22
Clear the stage area
3 people
- 23
Set up the stage
4 people
- 24
Set up the sound system
3 people
- 25
Set up lighting
2 people
- 26
Set up the hall and audience
4 people
- 27
Set up the catering table
2 people
- 28
Hang up decorations
2 people
- 29
Set up the information table
- 30
Register artists
2 people
- 31
Test the equipment
3 people
- 32
Set sound levels
2 people
- 33
Quickly soundcheck the performances
3 people
- 34
Welcome the audience
3 people
- 35
Distribute program
2 people
- 36
Give the opening speech
- 37
Guide the performances
3 people
- 38
Swap performers
2 people
- 39
Refill drinks
2 people
- 40
Serve snacks
2 people
- 41
Empty trash bins
2 people
- 42
Check toilets
- 43
Guide the audience out on departure
2 people
- 44
Make the final announcement
Aftercare
- 45
Turn off the sound system
2 people
- 46
Collect tableware
3 people
- 47
Dismantle the stage and hall
4 people
- 48
Sort and remove waste
2 people
- 49
Wash dishes
2 people
- 50
Clean the venue
3 people
- 51
Return materials
2 people
- 52
Empty and clean coolers
2 people
- 53
Store usable stock
- 54
Collect lost and found items
What to bring
Grouped the way you'd shop for it, with quantities.
Furniture
- Stage sectionsqty 6
- Stage steps
- Chairsqty 110
- Tablesqty 8
- Stoolsqty 6
- Coat racksqty 2
Equipment
- Active speakersqty 2
- Mixing console
- Microphonesqty 4
- Microphone standsqty 4
- DI boxesqty 2
- Music player
- Audio cablesqty 8
- Extension cordsqty 8
- Power stripsqty 6
Lighting
- Stage spotlightsqty 4
- Mood lightingqty 4
- Cable matsqty 6
Tableware
- Glassesqty 120
- Coffee cupsqty 60
- Platesqty 120
- Cutlery setsqty 120
Kitchen
- Coffee machinesqty 2
- Kettlesqty 2
- Coolersqty 4
- Serving plattersqty 8
- Serving spoonsqty 8
Decorations
- Stage drapesqty 3
- Buntingqty 6
- Tableclothsqty 8
- Flower arrangementsqty 4
- Name badgesqty 30
- Program standsqty 4
Cleaning
- Waste binsqty 6
- Bucketsqty 3
- Mopsqty 3
- Broom setsqty 2
Safety
- First aid kit
- Fire extinguishersqty 2
Catering
- Groceries
Tips
- Set a registration deadline at least 10 days before the event. Ask for the performer’s name, act length, technical requirements and dietary requirements in the same form, so you can create a workable running order without chasing details later.
- Allow 10 to 15 minutes for every performer changeover, even when acts are short. A microphone, DI box or music player may need to be swapped, and the published schedule should include those gaps rather than hiding them.
- Complete the technical plan at least 3 days beforehand. Check the active speakers, mixing console, microphones, stands, DI boxes, audio cables, extension cords and power strips together; discovering one missing cable during setup can delay the entire programme.
- Schedule the soundcheck before doors open, with a separate slot for each act that needs more than a microphone. Mark performers who bring instruments or backing tracks clearly on the run sheet and send them their arrival time in advance.
- Prepare drinks, cups, coffee equipment and serving items before the first audience members arrive. Chill drinks several hours beforehand, and assign a volunteer to refreshments so the host or stage manager is not pulled away during performances.
Frequently asked questions
- How far in advance should I organise an open stage?
- Start at least 4 to 6 weeks before the event. Confirm the venue and permits first, open registrations next, and close performer sign-ups around 10 days before the open stage so there is time to build and publish the programme.
- How long should each open stage performance be?
- Set a clear limit when performers register, such as 5 to 10 minutes per act. Add another 10 to 15 minutes between acts for introductions, equipment changes and unexpected delays.
- When should I publish the open stage programme?
- Publish the final programme 3 to 5 days before the event, after the performance schedule and technical requirements are confirmed. Send performers their individual arrival and soundcheck times at the same time.
- How early should the stage and sound system be set up?
- Begin physical setup at least 3 hours before the audience arrives. Reserve the final 60 to 90 minutes for soundcheck, lighting checks, cable safety and fixing problems before doors open.
Plans a lot like this one
Start this plan in Lizzt
Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.
Organize this event for free with LizztOrganize for free and invite your contacts!