How to organise a floating Christmas market
A floating Christmas market needs more than stalls, lights and festive food. Start by fixing the date, opening hours and waterfront location, then build the plan around permits, pontoons, power, toilets and water safety. Exhibitor registrations and pitch assignments follow once the layout is known. In the final week, weather, catering, refrigerated drinks, equipment and emergency routes need checking in a set order.
The plan, step by step
Every task with its own sub-checklist, in the order you'll actually need them.
Preparations
- 1
Confirm event date and times
2 people
- 2
Determine the market location
2 people
- 3
Apply for permits
- 4
Prepare a water safety plan
2 people
- 5
Reserve suppliers for pontoons
- 6
Reserve power supply
- 7
Reserve toilets
- 8
Invite exhibitors
2 people
- 9
Process registrations
2 people
- 10
Assign pitch locations
2 people
- 11
Collect dietary requirements
- 12
Send invitations
2 people
- 13
Publish visitor information
- 14
Send exhibitor information
- 15
Check the weather forecast
- 16
Place catering order
2 people
- 17
Inventory materials
2 people
- 18
Check vendor contact details
- 19
Do the shopping
3 people
- 20
Store drinks refrigerated
2 people
- 21
Prepare snacks
3 people
- 22
Have pontoons installed
4 people
- 23
Connect the pontoons
4 people
- 24
Anchor pontoons to the quay
4 people
- 25
Mark walking routes and emergency exits
2 people
- 26
Set up safety equipment
2 people
- 27
Connect power
2 people
- 28
Hang lighting
3 people
- 29
Build stalls and tents
6 people
- 30
Set up tables and chairs
4 people
- 31
Hang decorations
3 people
- 32
Set up catering stations
3 people
- 33
Set out drinks
2 people
- 34
Set out snacks
3 people
- 35
Test cash registers and payment points
2 people
- 36
Welcome exhibitors
3 people
- 37
Guide exhibitors to their spots
3 people
- 38
Conduct a safety check
2 people
Event
- 39
Start opening music
- 40
Welcome visitors
3 people
- 41
Monitor walking routes
2 people
- 42
Support exhibitors
2 people
- 43
Serve hot drinks
3 people
- 44
Serve hot snacks
3 people
- 45
Refill drinks
2 people
- 46
Refill snacks
2 people
- 47
Empty waste stations
2 people
- 48
Check toilets
- 49
Check the lighting
- 50
Operate the music
- 51
Announce the final round
- 52
Guide visitors to the exit
3 people
Aftercare
- 53
Have exhibitors take down their stands
4 people
- 54
Store catering leftovers safely
2 people
- 55
Wash the dishes and kitchenware
3 people
- 56
Collect waste
3 people
- 57
Clean the quay and pontoons
4 people
- 58
Remove decorations and lighting
3 people
- 59
Dismantle furniture
4 people
- 60
Disconnect the power supply
2 people
- 61
Have Pontoon Docks Removed
4 people
- 62
Return materials
2 people
- 63
Return borrowed items
2 people
- 64
Clear away leftover stock
2 people
- 65
Register lost property
What to bring
Grouped the way you'd shop for it, with quantities.
Furniture
- Floating pontoonsqty 8
- Christmas Market Stallsqty 12
- Party tentsqty 6
- Foldable tablesqty 18
- High tablesqty 8
- Folding chairsqty 60
- Bar stoolsqty 12
- Tablecloth clipsqty 48
Water safety
- Life ringsqty 6
- Rescue linesqty 6
- Life jacketsqty 20
- Crowd control barriersqty 16
- Non-slip matsqty 20
- Emergency exit signsqty 6
Lighting
- String lightsqty 12
- LED lanternsqty 20
- Batteriesqty 40
- Extension cordsqty 8
- Cable traysqty 12
Equipment
- Generator
- Speakersqty 2
- Mixer
- Microphoneqty 2
- Warming kettlesqty 4
- Kettlesqty 3
- Coffee machinesqty 3
- Coolersqty 6
- Card machinesqty 4
- Power stripsqty 8
Tableware
- Reusable cupsqty 250
- Wine glassesqty 120
- Platesqty 180
- Bowlsqty 120
- Cutlery setsqty 180
- Serving traysqty 12
Kitchen
- Thermos flasksqty 8
- Pitchersqty 6
- Cutting boardsqty 6
- Chef's knivesqty 6
- Serving tongsqty 12
- Serving spoonsqty 8
- Food warmersqty 6
- Cooling platesqty 8
Decorations
- Christmas treesqty 4
- Christmas baublesqty 120
- Christmas wreathsqty 12
- Christmas figuresqty 10
- Christmas clothsqty 12
- Directional signsqty 10
- Stand number signsqty 12
Cleaning
- Waste binsqty 12
- Mop setsqty 3
- Bucketsqty 6
- Hand broomsqty 6
- Dustpan and brushqty 4
- Cleaning clothsqty 30
- Glovesqty 12
- Hand soap dispensersqty 6
- Hand sanitizer pumpsqty 8
Catering
- Groceries
Tips
- Start the site plan before inviting exhibitors. Allow space for pontoons, market stalls, tents, walking routes, emergency exits, toilets and crowd-control barriers, then assign pitches only after the layout is workable.
- Treat water safety as a core workstream, not an add-on. Prepare the water safety plan early and have life rings, rescue lines, life jackets, non-slip mats and signed emergency exits ready before visitors arrive.
- Book infrastructure suppliers as soon as the date and location are confirmed. Pontoons, power and toilets can determine the site capacity, while late delivery leaves too little time for installation, connection and anchoring to the quay.
- Give exhibitors a firm information deadline. Collect registrations and dietary requirements before placing the catering order, and send pitch details, arrival instructions and power arrangements early enough for vendors to prepare.
- Run a final operational check in the last 24 hours. Confirm the weather forecast, vendor contact details, refrigerated drinks, lighting batteries, extension cords, cable trays, card machines and reusable cups before setup begins.
Frequently asked questions
- How long does it take to organise a floating Christmas market?
- Allow at least 8 to 12 weeks for a small market, and start earlier if permits, pontoons or multiple suppliers are involved. Exhibitor invitations should go out only after the location, date and basic layout are confirmed.
- When should I apply for permits for a floating Christmas market?
- Apply as soon as the date and waterfront location are fixed, ideally 8 to 12 weeks before the event. Permit requirements can affect the water safety plan, capacity, layout and operating hours.
- How many toilets does a floating Christmas market need?
- The required number depends on visitor capacity, event duration and local rules, so confirm the figure with the relevant authority and toilet supplier. Reserve units before publishing visitor information, with access routes shown on the site plan.
- When should pontoons be installed and anchored?
- Schedule installation with enough time for connection, anchoring and a full safety inspection before opening, typically at least one day in advance. Mark walking routes and emergency exits only after the final pontoon layout is secure.
Plans a lot like this one
Start this plan in Lizzt
Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.
Organize this event for free with LizztOrganize for free and invite your contacts!