How to organise a brewery open day
A brewery open day works best when you plan the visitor flow before you plan the tasting. Set the date and programme first, then open registrations with tour times, dietary questions and clear booking limits. In the final week, check the visitor route, beer stock, supplier deliveries and payment setup. On the day, keep tours, tastings, food, toilets and exits easy to find so guests are not standing in production areas or blocking the bar.
The plan, step by step
Every task with its own sub-checklist, in the order you'll actually need them.
Preparations
- 1
Set the date and program
2 people
- 2
Plan guided tours
2 people
- 3
Create a registration form
- 4
Send invitations
2 people
- 5
Publish event online
- 6
Process registrations
- 7
Collect dietary requirements
- 8
Confirm tour bookings
- 9
Inspect the brewery safely
2 people
- 10
Determine the Visitor Route
2 people
- 11
Make tour signs
- 12
Check beer information
2 people
- 13
Reserve tasting glasses
- 14
Compile the music playlist
- 15
Confirm supplier agreements
- 16
Check beer stock
2 people
- 17
Check the shopping list
2 people
- 18
Do the shopping
3 people
- 19
Chill beer
2 people
- 20
Prepare snacks
3 people
- 21
Print the registration list
- 22
Prepare name badges
2 people
- 23
Prepare cash register drawer
- 24
Check the weather forecast
- 25
Clean the grounds and entrance
3 people
- 26
Build party tents
4 people
- 27
Set up tables and chairs
4 people
- 28
Set up the bar
3 people
- 29
Set up tasting station
3 people
- 30
Block off the tour route
2 people
- 31
Hang up information boards
2 people
- 32
Hang decorations
2 people
- 33
Connect the sound system
2 people
- 34
Test the lighting
2 people
- 35
Check toilets
2 people
- 36
Place waste bins
2 people
- 37
Chill drinks
2 people
- 38
Display snacks
3 people
- 39
Set out dishes and glasses
2 people
- 40
Prepare tasting portions
3 people
- 41
Test the cash register and payment terminal
2 people
- 42
Give the guide briefing
4 people
- 43
Give the bar team briefing
4 people
Event
- 44
Staff the entrance desk
2 people
- 45
Welcome visitors
2 people
- 46
Explain the program
- 47
Serve beer tasting
4 people
- 48
Serve non-alcoholic drinks
2 people
- 49
Serve snacks
3 people
- 50
Guide the first tour
2 people
- 51
Lead the second tour
2 people
- 52
Guide the third tour
2 people
- 53
Guide the fourth tour
2 people
- 54
Guide the fifth tour
2 people
- 55
Debrief tours with visitors
- 56
Refill drinks
3 people
- 57
Collect glasses
2 people
- 58
Clean tables in between
2 people
- 59
Empty trash bins
2 people
- 60
Check bar stock
- 61
Inform visitors about closing
Aftercare
- 62
Close the bar
3 people
- 63
Close the register
2 people
- 64
Pack up the remaining snacks
2 people
- 65
Empty the refrigerators and coolers
2 people
- 66
Wash glasses and tableware
3 people
- 67
Clear tables and chairs
4 people
- 68
Take down party tents
4 people
- 69
Remove decorations
2 people
- 70
Clean the brewery floor
3 people
- 71
Clean the grounds and entrance
3 people
- 72
Dispose of waste
2 people
- 73
Clean equipment
2 people
- 74
Put brewery materials back
2 people
- 75
Return borrowed items
2 people
- 76
Store leftover stock
2 people
- 77
Collect lost property
- 78
Archive registration details
What to bring
Grouped the way you'd shop for it, with quantities.
Furniture
- Party tentsqty 3
- High tablesqty 12
- Tablesqty 8
- Chairsqty 80
- Bar stoolsqty 12
- Cash desk table
- Bollardsqty 12
Tableware
- Sample glassesqty 250
- Water glassesqty 100
- Platesqty 180
- Cutlery setsqty 180
- Coffee cupsqty 60
- Serving traysqty 12
Kitchen
- Cutting boardsqty 6
- Chef's knivesqty 4
- Serving tongsqty 8
- Small bowlsqty 20
- Measuring cupsqty 3
- Thermos flasksqty 6
- Coolersqty 8
- Ice bucket traysqty 6
Equipment
- Tap installationsqty 4
- Beer kegsqty 12
- Payment terminalsqty 2
- Extension cordsqty 8
- Power stripsqty 6
- Portable speakersqty 2
- Microphone
- Drip trays for the beer tapqty 4
- Hand pumpsqty 2
Decorations
- Beer postersqty 12
- Buntingqty 8
- Tableclothsqty 12
- Name badgesqty 180
- Info boardsqty 10
- Program leafletsqty 220
- Directional signsqty 12
- Chalkboardsqty 6
Lighting
- String lightsqty 8
- LED lampsqty 12
- Outdoor lightsqty 6
Cleaning
- Waste binsqty 12
- Bucketsqty 6
- Mopsqty 6
- Broom setsqty 4
- Cleaning cartsqty 2
- Glovesqty 12
- Towelsqty 30
- Toilet brushesqty 4
Catering
- Groceries
Safety
- First aid kitsqty 2
- Safety vestsqty 8
- Work glovesqty 12
- Hearing protectionqty 20
- Floor markingsqty 4
Information
- Clipboardsqty 6
- Pensqty 30
- Notepadsqty 10
- Price listsqty 20
- Beer tasting formsqty 200
- Wristbandsqty 250
- Receipt rollsqty 6
Tools
- Cable tiesqty 200
- Duct tapeqty 6
- Cable tie cutterqty 2
- Wrenchesqty 2
- Rubber malletsqty 2
- Flashlightsqty 6
Tips
- Set tour capacity before publishing the registration form. Allow enough time between groups to finish a tour, reset the route and move guests safely; print the final booking list and prepare name badges before opening.
- Inspect the brewery as a visitor, not only as a brewer. Mark the visitor route with signs and bollards, keep extension cords out of walkways, and separate tasting areas from active equipment and deliveries.
- Plan the tasting quantities from the booking list. Chill the beer in advance, reserve sample glasses, and provide water glasses and water at the tasting point so guests can pace themselves and staff can clear used glassware.
- Do not leave payment and serving equipment until the morning of the event. Test payment terminals, the cash drawer, tap installations, drip trays and hand pumps at least one day earlier, with spare power strips and extension cords available.
- Make a weather decision before guests arrive. Check the forecast the day before and again on the morning, then place party tents, tables and high tables so queues, snacks and registration remain usable if people need shelter.
Frequently asked questions
- How far in advance should I plan a brewery open day?
- Start planning at least 8 weeks ahead. Set the date and programme first, then allow 4 to 6 weeks for invitations, online registration and tour bookings. Use the final week for stock, supplier confirmations, signage and safety checks.
- How many people should be in one brewery tour group?
- Choose a group size that keeps every guest within sight and hearing of the guide; many breweries use about 10 to 15 people per tour. Add at least 15 minutes between groups for movement, questions and resetting the route.
- When should I chill beer for a brewery open day?
- Check stock and cooling capacity 2 days before the event, then chill the beer at least 12 to 24 hours before serving. Keep extra stock cold where possible and avoid opening every keg or bottle at once.
- What should I check the day before a brewery open day?
- Confirm supplier agreements, tour bookings, dietary requirements, beer information and the weather forecast. Also test payment terminals and taps, print the registration list, prepare name badges, clean the entrance and verify that the visitor route is signed.
Plans a lot like this one
Start this plan in Lizzt
Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.
Organize this event for free with LizztOrganize for free and invite your contacts!