Heritage exhibition checklist

A heritage exhibition involves more than selecting interesting objects. You need a clear loan trail, safe handling, readable interpretation, a workable visitor route and enough time for printing, transport and setup. Start by fixing the date, opening hours and room layout, then work through lenders, texts, publicity and event logistics. This checklist helps you see what needs to happen first, what can wait, and which small details are often left until the last day.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Set date and opening hours

    2 people

  • Confirm the venue and room layout

    2 people

  • Select exhibition pieces

    3 people

  • Contact lenders and rights holders

    2 people

  • Record loan agreements

    2 people

  • Create a loan register for items

  • Photograph objects on receipt

    2 people

  • Write exhibition texts

    2 people

  • Have texts checked

    2 people

  • Design signs and a route map

  • Print signs and route map

  • Send invitations

    2 people

  • Publish event online

  • Process registrations

  • Collect dietary requirements

  • Book catering

  • Arrange transport for objects

    2 people

  • Make reservations for materials

  • Prepare press release and press list

  • Send press release

  • Do the shopping

    2 people

  • Check objects and materials

    2 people

  • Prepare reception area

    2 people

  • Set up exhibition panels

    3 people

  • Set up display cases and pedestals

    3 people

  • Set up tables and chairs

    3 people

  • Unpack exhibition pieces

    3 people

  • Place exhibition pieces

    3 people

  • Attach object labels

    2 people

  • Place route and audience signs

    2 people

  • Adjust the lighting

    2 people

  • Test the screen and presentation

    2 people

  • Set up the cloakroom

    2 people

  • Set out coffee and tea

    2 people

  • Chill drinks

    2 people

  • Prepare snacks

    3 people

  • Set up the registration table

    2 people

  • Brief volunteers

    2 people

  • Carry out the final safety check

    2 people

Event

  • Welcome visitors

    3 people

  • Check off registrations

    2 people

  • Guide tours

    2 people

  • Answer visitors' questions

    2 people

  • Serve snacks

    2 people

  • Serve drinks

    2 people

  • Refill drinks

    2 people

  • Refill coffee and tea

  • Check the hall and display cases

    2 people

  • Guide visitors to the exit

    2 people

Aftercare

  • Register exhibition items

    2 people

  • Pack exhibition pieces

    3 people

  • Dismantle display cases and panels

    3 people

  • Put furniture back

    3 people

  • Wash dishes

    2 people

  • Collect and remove waste

    2 people

  • Clean the hall and restrooms

    2 people

  • Remove decorations and signage

    2 people

  • Return borrowed materials

    2 people

  • Return Items

    2 people

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Exhibition panelsqty 12
  • Display casesqty 6
  • Pedestalsqty 8
  • Tablesqty 8
  • Chairsqty 40
  • Coat racksqty 2
  • Bollardsqty 8
  • Stoolsqty 6

Equipment

  • Laptop
  • Monitor screen
  • HDMI cablesqty 2
  • Extension cordsqty 6
  • Power stripsqty 6
  • Cable traysqty 8
  • Walkie-talkiesqty 4
  • Power banksqty 4
  • Flashlightsqty 4

Lighting

  • LED spotlightsqty 12
  • Mood lightingqty 4

Decorations

  • Entrance banner
  • Wayfinding signsqty 8
  • Tableclothsqty 8
  • Photo framesqty 12
  • Information boardsqty 6
  • Adhesive stripsqty 2
  • Tapeqty 4
  • Rope barrierqty 4

Tableware

  • Glassesqty 120
  • Coffee cupsqty 60
  • Platesqty 120
  • Cutlery setsqty 120
  • Serving plattersqty 12
  • Serving tongsqty 6

Kitchen

  • Coffee machinesqty 2
  • Kettlesqty 2
  • Coolersqty 3
  • Thermos flasksqty 4
  • Cutting boardsqty 2
  • Bread knivesqty 2
  • Paper towel holdersqty 2
  • Cash drawer
  • Calculator
  • Clipboardsqty 4
  • Pensqty 20
  • Name stickersqty 120
  • Wristbandsqty 120

Cleaning

  • Vacuum cleaner
  • Mopqty 2
  • Bucketsqty 2
  • Cleaning clothsqty 12
  • Hand broomsqty 2
  • Waste binsqty 6

Catering

  • Groceries

Tips

  • Confirm the room layout before designing the route map or ordering panels. Mark display cases, pedestals, power points, the reception area and any rope barriers so the visitor flow works before installation begins.
  • Allow time between receiving an object and displaying it. Photograph every item on arrival, record it in the loan register and check its condition before it goes into a case or onto a pedestal.
  • Treat exhibition text as a production deadline, not a final-minute task. Write the labels and route map early, have the text checked, then leave enough time to print signs and correct names, dates or lender credits.
  • Close registration details before booking catering. Count confirmed visitors, collect dietary requirements and check that you have enough glasses, coffee cups, plates, cutlery and serving utensils for the reception.
  • Test the technical setup before visitors arrive. Check the laptop, monitor, HDMI cables, extension cords, power strips and LED spotlights together, and secure cables so they do not cross the public route.

Frequently asked questions

How far in advance should I plan a heritage exhibition?
Start planning at least 8 to 12 weeks before opening. Lenders, rights holders, transport, checked texts, printing and press outreach all need lead time, especially when several objects come from different sources.
When should I contact lenders for a heritage exhibition?
Contact lenders and rights holders at least 6 to 8 weeks before opening. Record each agreement and create the loan register before objects are transported, so ownership, permissions and condition are clear.
When should exhibition labels and signs be printed?
Finish and check exhibition texts at least 2 weeks before opening, then print the signs and route map. Keep a few days for corrections and install everything before the final setup day.
How long does it take to set up a heritage exhibition?
Allow at least one full day for a small exhibition and two days if you are installing panels, cases, pedestals, lighting and a visitor route. Schedule the object check and technical test before opening, not during the reception.