Painting Workshop Checklist

A painting workshop needs more than canvases and paint. You have to secure a suitable venue, book the teacher, collect registrations, prepare materials, and arrange the room so people can start working immediately. Plan the practical details early: dietary requirements, power access, drying space, parking information, and name badges are easy to overlook. Use this checklist to work from the first booking through participant check-in and the final table setup.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Reserve venue

  • Book teacher

  • Define theme and technology

    2 people

  • Send invitations

  • Process registrations

  • Collect dietary requirements

  • Finalize the participant list

  • Send program to attendees

  • Inventory materials

    2 people

  • Purchase painting supplies

    2 people

  • Do the shopping

    2 people

  • Check food and drinks

  • Prepare canvas sheets

    2 people

  • Make name badges

  • Check route and parking

Event

  • Open venue

    2 people

  • Set up worktables

    3 people

  • Set out chairs

    2 people

  • Set out painting supplies

    3 people

  • Lay protective film

    2 people

  • Set up the buffet and drinks table

    2 people

  • Prepare coffee and tea

  • Set up the check-in desk

  • Receive participants

    2 people

  • Hand out name badges

  • Introduce workshop

  • Demonstrate painting technique

  • Guide participants

    3 people

  • Refill drinks

  • Serve snack breaks

    2 people

  • Clean work tables in between

    2 people

  • Let the paintings dry

    2 people

  • Serve the buffet

    3 people

  • Present projects

    2 people

  • Pack items safely

    2 people

  • See participants off

    2 people

Aftercare

  • Collect used paint

    2 people

  • Clean materials

    3 people

  • Clear tables and chairs

    3 people

  • Collect and remove waste

    2 people

  • Clean the venue

    3 people

  • Retrieve supplies

    2 people

  • Return borrowed materials

    2 people

  • Send thank-you message

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Work tablesqty 8
  • Chairsqty 32
  • Buffet tablesqty 2
  • Check-in desk
  • Drying racksqty 4

Equipment

  • Coffee machinesqty 2
  • Kettlesqty 2
  • Coolersqty 2
  • Extension cordsqty 4
  • Power stripsqty 6
  • Presentation screen

Painting supplies

  • Canvas clothsqty 32
  • Acrylic paint setsqty 32
  • Brush setsqty 32
  • Mixing palettesqty 32
  • Water bowlsqty 32
  • Palette knivesqty 16
  • Painter’s spongesqty 16
  • Pencil setsqty 16
  • Erasersqty 32
  • Pencil sharpenersqty 8
  • Sketchbooksqty 32
  • Apronsqty 32
  • Paint traysqty 32
  • Mixing cupsqty 32
  • Covering filmqty 4
  • Painter's tapeqty 8
  • Project labelsqty 40

Tableware

  • Reusable cupsqty 50
  • Platesqty 40
  • Cutlery setsqty 40
  • Serving plattersqty 8
  • Serving spoonsqty 6

Kitchen

  • Cutting boardsqty 3
  • Chef's knifeqty 3
  • Bread basketsqty 3
  • Water jugsqty 4

Decorations

  • Name badgesqty 40
  • Table runnersqty 4

Cleaning

  • Bucketsqty 4
  • Cleaning clothsqty 16
  • Hand broomsqty 2
  • Vacuum cleaner
  • Mop headsqty 2

Lighting

  • Desk lampsqty 8

Catering

  • Groceries

Tips

  • Confirm the room layout before buying supplies. Allow enough table space for each participant’s canvas, palette, water bowl, and brushes, plus clear walkways between the worktables.
  • Count materials against the final participant list at least 7 days before the workshop. Include spare brushes, mixing cups, protective film, aprons, and labels rather than ordering only the exact headcount.
  • Send the program and route information 3–5 days before the event. Include the start time, parking details, what participants should wear, and when check-in opens.
  • Set up the room in this order: cover the work surfaces, place chairs, distribute painting supplies, prepare the drying racks, and then test the presentation screen and extension cords.
  • Prepare the coffee, tea, drinks, and buffet before participants arrive, but keep the check-in desk separate from the food table. This prevents queues from blocking the entrance during the first 15 minutes.

Frequently asked questions

How far in advance should I plan a painting workshop?
Book the venue and teacher at least 6–8 weeks ahead, especially if you need a specific date or a presentation screen. Finalize registrations and dietary requirements about 7 days before the workshop.
How many painting supplies do I need per participant?
Prepare one canvas, apron, paint set, brush set, palette, water bowl, pencil set, eraser, and sketchbook per participant. Add roughly 10% spare brushes, cups, and small tools for damage, spills, or late registrations.
When should I set up the painting workshop room?
Open the venue 90–120 minutes before participants arrive. Set up tables, chairs, protective film, supplies, drying racks, refreshments, and the check-in desk before the scheduled start time.
What should I send painting workshop attendees beforehand?
Send the program, start and end times, route and parking information, and any clothing guidance 3–5 days in advance. Ask for dietary requirements no later than 7 days before the event so food and drinks can be checked in time.

Start this plan in Lizzt

Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.

Organize this event for free with Lizzt

Organize for free and invite your contacts!