Painting Workshop Checklist

A painting workshop runs smoothly when registration, materials and room setup are handled in the right order. Start by confirming the participant list, dietary requirements, teacher arrangements and room booking before buying supplies. On the day, allow time to cover tables, place canvases and easels, connect lighting and prepare the reception table. This checklist also helps you avoid late jobs such as printing instructions, sorting materials and arranging enough space for drying paintings.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Create the participant list

  • Send invitations

  • Process registrations

  • Collect dietary requirements

  • Confirm participants

  • Check the room booking

  • Confirm teacher arrangements

  • Develop the painting program

  • Check the shopping list

  • Do the shopping

    2 people

  • Sort materials

    2 people

  • Making participant badges

  • Print instruction sheets

  • Set out canvases

    2 people

  • Cover the tables

    2 people

  • Set up tables

    3 people

  • Set up chairs

    2 people

  • Place easels and drying racks

    2 people

  • Connect lighting

    2 people

  • Set up supply tables

    2 people

  • Prepare coffee and tea

    2 people

  • Set out snacks

    2 people

  • Set up the reception table

Event

  • Receive participants

    3 people

  • Register attendance

  • Lay out materials

  • Demonstrate painting technique

  • Guide participants

    3 people

  • Refill drinks

  • Serve snacks

    2 people

  • Let creations dry

    2 people

  • Restock break snacks

  • Support the evening program

    3 people

  • Present projects

    2 people

  • See participants off

    2 people

Aftercare

  • Collect paint and materials

    3 people

  • Clear tables and chairs

    3 people

  • Wash dishes

    2 people

  • Clean the room

    3 people

  • Collect waste

    2 people

  • Pack up materials

    2 people

  • Arrange collection of artworks

  • Check for lost items

  • Set out return materials

  • Return borrowed materials

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Tablesqty 6
  • Chairsqty 30
  • Presentation tablesqty 2
  • Clothes racks

Equipment

  • Easelsqty 24
  • Drying racksqty 4
  • Extension cordsqty 4
  • Power stripsqty 4
  • Coffee machinesqty 2
  • Kettlesqty 2

Tableware

  • Reusable cupsqty 36
  • Coffee mugsqty 30
  • Platesqty 30
  • Cutlery setsqty 30
  • Serving jugsqty 4

Kitchen

  • Thermos flasksqty 4
  • Serving plattersqty 6
  • Serving traysqty 4

Decorations

  • Tableclothsqty 6
  • Welcome sign
  • Name badgesqty 30
  • Directional signsqty 6

Cleaning

  • Bucketsqty 4
  • Spongesqty 8
  • Cleaning clothsqty 12
  • Mopsqty 2
  • Broom setsqty 2
  • Cleaning glovesqty 6

Catering

  • Groceries

Tips

  • Set a registration deadline at least 7 days before the workshop. Use the final participant list to confirm attendance, dietary requirements and the number of canvases, easels and instruction sheets needed.
  • Check the room layout before the day itself. Allow enough space between tables for chairs, easels and people carrying wet paintings, and identify power points before positioning lighting and extension cords.
  • Finish shopping and material sorting at least 1 day ahead. Group supplies by workstation so participants are not waiting for shared materials while the teacher is explaining the first exercise.
  • Plan the setup backwards from the start time. Allow at least 90 minutes for tables, chairs, table coverings, canvases, easels, drying racks, signs and the reception table; add extra time if the room needs cleaning first.
  • Prepare refreshments before participants arrive, not during registration. Set out coffee, tea, cups, mugs, plates and snacks in a separate area so the welcome table stays clear and attendance can be recorded quickly.

Frequently asked questions

How far in advance should I organize a painting workshop?
Start planning at least 4 weeks ahead, especially if a teacher and room must be confirmed. Close registrations about 7 days before the workshop so you can finalize materials, dietary requirements and refreshments.
How long does it take to set up a painting workshop?
Allow around 90 minutes for a prepared room and closer to 2 hours if tables, chairs, easels, drying racks and lighting all need to be arranged. Keep the final 15 minutes for signage, reception materials and a safety check.
What should I prepare the day before a painting workshop?
Sort the painting materials, check the shopping list, print instruction sheets, prepare name badges and confirm the final participant list. Set aside at least 30 minutes to check that every workstation has the required materials.
How should I arrange tables and easels for a painting workshop?
Leave clear walking space between tables and place easels where participants can work without blocking doors or shared supply tables. Position drying racks near the work area and check the layout at least 1 day before the workshop.

Start this plan in Lizzt

Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.

Organize this event for free with Lizzt

Organize for free and invite your contacts!