How to organise a tree planting day
A successful tree planting day starts with the site, not the invitations. Confirm the landowner’s permission, check underground excavation risks and create a planting plan before ordering trees or assigning volunteers. Then build the day around clear instructions, marked planting holes, suitable tools and a weather plan. The details people often leave too late are temporary tree storage, watering, route information, waste collection and keeping drinks cold.
The plan, step by step
Every task with its own sub-checklist, in the order you'll actually need them.
Preparations
- 1
Set the planting location
2 people
- 2
Develop the planting plan
2 people
- 3
Select soil and trees
2 people
- 4
Order trees and shrubs
- 5
Arrange permission from the landowner
- 6
Check excavation sites
2 people
- 7
Send invitations
2 people
- 8
Process registrations
- 9
Collect dietary requirements
- 10
Assign volunteers
2 people
- 11
Create planting instructions
2 people
- 12
Share the program and route
- 13
Book catering
- 14
Arrange waste collection
- 15
Check the weather forecast
- 16
Inform participants again
- 17
Check the shopping list
2 people
- 18
Do the shopping
2 people
- 19
Receive trees and materials
4 people
- 20
Store trees temporarily
3 people
- 21
Water the trees
2 people
- 22
Mark out planting holes
3 people
- 23
Gather tools
2 people
- 24
Set out first aid and safety equipment
2 people
- 25
Chill drinks
2 people
- 26
Prepare coffee and tea
2 people
- 27
Prepare lunch packs
3 people
- 28
Set up tables and chairs
4 people
- 29
Build party tents
4 people
- 30
Set up the registration table
2 people
- 31
Put up info boards
2 people
- 32
Distribute tools by team
3 people
- 33
Bring trees to planting locations
6 people
- 34
Mark off a safe walkway
2 people
Event
- 35
Staff the registration desk
2 people
- 36
Welcome participants
3 people
- 37
Hand out work gloves
2 people
- 38
Give safety instructions
2 people
- 39
Assemble planting teams
3 people
- 40
Give a plant demo
2 people
- 41
Dig planting holes
12 people
- 42
Place trees in planting holes
10 people
- 43
Straighten the trees
6 people
- 44
Fill planting holes
12 people
- 45
Tie up trees
6 people
- 46
Water the trees
6 people
- 47
Photograph the planting result
- 48
Collect tools
3 people
- 49
Guide handwashing
2 people
- 50
Set up the buffet
4 people
- 51
Serving food
5 people
- 52
Refill drinks
2 people
- 53
Serve coffee and tea
2 people
- 54
Supervise children's activity
3 people
- 55
Explain the plant watch
- 56
Collect waste separately
2 people
- 57
Walk the final round around the trees
3 people
- 58
Thank participants
2 people
- 59
Turn on lighting
- 60
Store leftovers safely
2 people
Aftercare
- 61
Clear the buffet
4 people
- 62
Bring waste to the collection point
3 people
- 63
Wash dishes
4 people
- 64
Clear tables and chairs
4 people
- 65
Take down party tents
4 people
- 66
Clean the venue
5 people
- 67
Clean tools
3 people
- 68
Return tools
2 people
- 69
Return rental items
2 people
- 70
Store leftover food
2 people
- 71
Inspect the trees
2 people
- 72
Water trees again
2 people
- 73
Record plant data
2 people
What to bring
Grouped the way you'd shop for it, with quantities.
Furniture
- Party tentsqty 2
- Foldable tablesqty 8
- Folding chairsqty 60
- Buffet tablesqty 3
- Bar stoolsqty 6
- Waste binsqty 6
Tableware
- Reusable platesqty 70
- Reusable cupsqty 100
- Coffee cupsqty 60
- Cutlery setsqty 70
- Serving spoonsqty 8
- Coffee potsqty 3
- Teapotsqty 2
Kitchen
- Coolersqty 4
- Cutting boardsqty 4
- Chef's knifeqty 4
- Bread knivesqty 3
- Serving plattersqty 10
- Serving tongsqty 6
- Cut-resistant glovesqty 4
- Kettlesqty 2
- Thermos flasksqty 6
Equipment
- Extension cordsqty 4
- Power stripsqty 4
Lighting
- LED lampsqty 8
- String lightsqty 4
- Flashlightsqty 8
Sports equipment
- Shovelsqty 12
- Scoopsqty 8
- Rakesqty 8
- Hoesqty 6
- Wheelbarrowsqty 6
- Pitchersqty 10
- Water hosesqty 3
- Tree stakesqty 60
- Tree stakesqty 60
- Tree strapsqty 60
- Plantersqty 6
- Measuring tapesqty 4
- Augersqty 3
- Buckets of waterqty 12
- Rope rollsqty 4
- Work glovesqty 70
- Knee padsqty 20
- Safety gogglesqty 30
- Safety vestsqty 20
- Rain barrelsqty 2
- Plant labelsqty 70
- Waterproof markersqty 10
- Measuring rulersqty 4
- Wooden hammersqty 6
- Garden tool setsqty 10
- Bootsqty 20
- Rain ponchosqty 30
- Picnic blanketsqty 8
Decorations
- Route arrowsqty 12
- Info boardsqty 4
- Chalkboardsqty 3
- Tableclothsqty 8
- Name stickersqty 80
- Buntingqty 6
- Markersqty 20
- Notepadsqty 10
Cleaning
- Broom setsqty 3
- Dustpan and brushqty 4
- Washing-up tubsqty 4
- Hand soap dispensersqty 4
- Towel rollsqty 6
- Microfiber clothsqty 20
- Work bucketsqty 6
- Litter pickersqty 4
- First aid kitsqty 2
- Fire extinguishersqty 2
Catering
- Groceries
Tips
- Set the planting location and planting plan first. Mark the planting holes before participants arrive, and match the number of trees to the available space, access route and volunteer capacity.
- Order trees and shrubs only after confirming permission, soil conditions and delivery timing. Arrange a temporary storage area in advance, and plan how the trees will be watered before planting.
- Give each volunteer a clear role and send the programme, route and practical instructions before the event. Send a final update after checking the weather forecast, ideally 24 to 48 hours beforehand.
- Prepare safety equipment, first aid supplies and cut-resistant gloves before setting out shovels, scoops and rakes. Check excavation sites and keep extension cords, lighting and any catering equipment away from planting work.
- Plan the end of the day as carefully as the start: arrange waste collection, check the shopping list and chill drinks before people arrive. If catering is served, set out reusable plates, cups and cutlery separately from muddy work areas.
Frequently asked questions
- How far in advance should I organise a tree planting day?
- Start at least 6 to 8 weeks ahead. Permission, site checks, tree orders, volunteer registrations and catering all need time, and tree delivery should be confirmed before the final instructions are sent.
- How many volunteers do I need for a tree planting day?
- Use the number of planting holes and available tools to set the team size. As a practical starting point, plan one small planting team per 10 to 15 trees, then assign separate people to registration, safety, refreshments and watering.
- When should trees be delivered for a planting event?
- Arrange delivery as close to planting as possible, preferably within 24 to 48 hours. If that is not possible, prepare a shaded temporary storage area and water the trees according to the supplier’s instructions.
- What should I do if the weather forecast is bad?
- Check the forecast 48 hours before the event and again on the morning itself. Decide in advance whether heavy rain, frost, high winds or unsafe ground conditions require postponement, and inform participants as soon as the decision is made.
Plans a lot like this one
Start this plan in Lizzt
Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.
Organize this event for free with LizztOrganize for free and invite your contacts!