Insect Hotel Building Day Checklist

Use this checklist to organise an insect hotel building day from the first booking to the final clean-up. It covers the details that are easy to overlook: preparing cut timber, sorting natural filling materials, testing drills and assigning enough adult support. Plan the work in clear stages so participants can register, receive safety instructions and start building without waiting for tools or materials. Allow extra time for setting up workstations and checking the weather if part of the event is outdoors.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • Reserve workspace

  • Set the date and program

    2 people

  • Send invitations

    2 people

  • Process registrations

  • Collect dietary requirements

  • Assign volunteers

    2 people

  • Check the weather forecast

  • Check the shopping list

  • Check building materials

    2 people

  • Test tools

    2 people

  • Do the shopping

    2 people

  • Lay out the wood and filling material

    3 people

Event

  • Open venue

    2 people

  • Set up tables and chairs

    4 people

  • Set up party tents

    4 people

  • Set up build stations

    3 people

  • Distribute tools per table

    3 people

  • Post safety instructions

  • Prepare coffee and tea

    2 people

  • Receive participants

    3 people

  • Register attendance

    2 people

  • Give construction instructions

    2 people

  • Explain safe use

    2 people

  • Have wood cut to size

    3 people

  • Guide building groups

    6 people

  • Supervise drilling work

    3 people

  • Distribute filling material

    2 people

  • Serve coffee and tea

    2 people

  • Serve snacks

    2 people

  • Refill drinks

  • Clear work tables between tasks

    2 people

  • Finish insect hotels

    4 people

  • Provide placement advice

  • Photograph the projects

  • Thank participants

  • Set up the evening meal

    3 people

  • Serve dinner

    3 people

  • Sort waste during the event

  • Check the venue and materials

    2 people

  • Collect tools

    3 people

  • Store insect hotels safely

    2 people

Aftercare

  • Take down tables and chairs

    4 people

  • Take down party tents

    4 people

  • Collect waste

    3 people

  • Wash dishes

    2 people

  • Clean work area

    4 people

  • Return borrowed tools

    2 people

  • Store leftover materials

    2 people

  • Send participant information

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Party tentqty 2
  • Tablesqty 8
  • Chairsqty 60
  • Workbenchesqty 6
  • Waste binsqty 4

Equipment

  • Drill standqty 3
  • Cordless drill driversqty 6
  • Extension cordsqty 6
  • Power stripsqty 6

Tools

  • Hand sawsqty 6
  • Hammerqty 8
  • Screwdriversqty 12
  • Drill bitsqty 24
  • Measuring tapesqty 8
  • Pencilsqty 30
  • Clampsqty 12

Safety

  • Safety gogglesqty 30
  • Work glovesqty 30
  • Ear defendersqty 12
  • Dust masksqty 30

Construction materials

  • Untreated wooden cratesqty 30
  • Untreated wooden boardsqty 40
  • Bamboo polesqty 100
  • Hollow stemsqty 150
  • Tree slicesqty 60
  • Pine conesqty 100
  • Wood chipsqty 6
  • Terracotta potsqty 40

Confirmation

  • Wood screwsqty 500
  • Hanging hooksqty 30
  • Ropeqty 100

Tableware

  • Reusable cupsqty 70
  • Platesqty 70
  • Cutlery setsqty 70
  • Coffee potsqty 3
  • Teapotsqty 2

Catering

  • Coolersqty 3
  • Water jugsqty 4
  • Groceries

Decorations

  • Information boardsqty 6
  • Name badgesqty 70
  • Markersqty 12
  • Paper tableclothsqty 8

Cleaning

  • Bucketsqty 4
  • Spongesqty 8
  • Hand broomsqty 4
  • Dustpan and brushqty 3

Lighting

  • Work lightsqty 4

Tips

  • Confirm the workspace at least 3–4 weeks before the building day, then set the date, programme and registration deadline. Ask for dietary requirements when people sign up rather than trying to collect them on the day.
  • Check the building materials and have the wooden boards cut to size before participants arrive. Count screws, hooks and filling materials separately; small items such as bamboo poles, hollow stems and pine cones are easy to underestimate.
  • Test every cordless drill, drill bit, extension cord and power strip at least 2 days in advance. Put one complete tool set at each workstation and keep spare batteries, bits and hand tools in a central box.
  • Set up tables, workbenches, chairs, tents and waste bins before opening the venue. Leave clear walkways between stations, and place safety goggles, gloves, ear defenders and dust masks where each group can reach them.
  • Give a short demonstration before construction begins, including safe drill and saw use and how to handle wood chips. Assign one guide to each building group where possible, especially if children or first-time tool users are attending.

Frequently asked questions

How long does an insect hotel building day take?
Allow 3–4 hours for a typical session, including arrival, registration, safety instructions and construction. Add at least 60 minutes beforehand for setting up tables, tools and materials, and 30 minutes afterwards for sorting tools and waste.
How many volunteers do I need for an insect hotel workshop?
Plan on one experienced volunteer for every 6–8 participants when drills, saws and hammers are being used. Have one additional person handle registration, refreshments and general questions instead of leaving those jobs to the building guides.
When should I prepare the insect hotel materials?
Prepare and count the timber, screws and natural filling materials 2–3 days before the event. Cut the boards and test the tools by the day before, so missing parts can still be replaced without delaying the programme.
What should I do if the insect hotel building day is outdoors?
Check the weather forecast 48 hours beforehand and again on the morning of the event. Set up party tents or another covered workspace, protect electrical connections from rain and decide by the previous day whether the event needs to move indoors.

Start this plan in Lizzt

Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.

Organize this event for free with Lizzt

Organize for free and invite your contacts!