How to organise an insect hotel building day

An insect hotel building day works best when construction is organised in small, well-equipped stations rather than as one large group activity. Set the date and programme first, then confirm the workspace, volunteers, materials and tools before inviting participants. Prepare pre-cut wood, filling materials and safety guidance in advance so the building session can start on time. This guide follows the practical order of the day, from setting up tables to guiding each group through construction.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • 1

    Reserve workspace

  • 2

    Set the date and program

    2 people

  • 3

    Send invitations

    2 people

  • 4

    Process registrations

  • 5

    Collect dietary requirements

  • 6

    Assign volunteers

    2 people

  • 7

    Check the weather forecast

  • 8

    Check the shopping list

  • 9

    Check building materials

    2 people

  • 10

    Test tools

    2 people

  • 11

    Do the shopping

    2 people

  • 12

    Lay out the wood and filling material

    3 people

Event

  • 13

    Open venue

    2 people

  • 14

    Set up tables and chairs

    4 people

  • 15

    Set up party tents

    4 people

  • 16

    Set up build stations

    3 people

  • 17

    Distribute tools per table

    3 people

  • 18

    Post safety instructions

  • 19

    Prepare coffee and tea

    2 people

  • 20

    Receive participants

    3 people

  • 21

    Register attendance

    2 people

  • 22

    Give construction instructions

    2 people

  • 23

    Explain safe use

    2 people

  • 24

    Have wood cut to size

    3 people

  • 25

    Guide building groups

    6 people

  • 26

    Supervise drilling work

    3 people

  • 27

    Distribute filling material

    2 people

  • 28

    Serve coffee and tea

    2 people

  • 29

    Serve snacks

    2 people

  • 30

    Refill drinks

  • 31

    Clear work tables between tasks

    2 people

  • 32

    Finish insect hotels

    4 people

  • 33

    Provide placement advice

  • 34

    Photograph the projects

  • 35

    Thank participants

  • 36

    Set up the evening meal

    3 people

  • 37

    Serve dinner

    3 people

  • 38

    Sort waste during the event

  • 39

    Check the venue and materials

    2 people

  • 40

    Collect tools

    3 people

  • 41

    Store insect hotels safely

    2 people

Aftercare

  • 42

    Take down tables and chairs

    4 people

  • 43

    Take down party tents

    4 people

  • 44

    Collect waste

    3 people

  • 45

    Wash dishes

    2 people

  • 46

    Clean work area

    4 people

  • 47

    Return borrowed tools

    2 people

  • 48

    Store leftover materials

    2 people

  • 49

    Send participant information

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Party tentqty 2
  • Tablesqty 8
  • Chairsqty 60
  • Workbenchesqty 6
  • Waste binsqty 4

Equipment

  • Drill standqty 3
  • Cordless drill driversqty 6
  • Extension cordsqty 6
  • Power stripsqty 6

Tools

  • Hand sawsqty 6
  • Hammerqty 8
  • Screwdriversqty 12
  • Drill bitsqty 24
  • Measuring tapesqty 8
  • Pencilsqty 30
  • Clampsqty 12

Safety

  • Safety gogglesqty 30
  • Work glovesqty 30
  • Ear defendersqty 12
  • Dust masksqty 30

Construction materials

  • Untreated wooden cratesqty 30
  • Untreated wooden boardsqty 40
  • Bamboo polesqty 100
  • Hollow stemsqty 150
  • Tree slicesqty 60
  • Pine conesqty 100
  • Wood chipsqty 6
  • Terracotta potsqty 40

Confirmation

  • Wood screwsqty 500
  • Hanging hooksqty 30
  • Ropeqty 100

Tableware

  • Reusable cupsqty 70
  • Platesqty 70
  • Cutlery setsqty 70
  • Coffee potsqty 3
  • Teapotsqty 2

Catering

  • Coolersqty 3
  • Water jugsqty 4
  • Groceries

Decorations

  • Information boardsqty 6
  • Name badgesqty 70
  • Markersqty 12
  • Paper tableclothsqty 8

Cleaning

  • Bucketsqty 4
  • Spongesqty 8
  • Hand broomsqty 4
  • Dustpan and brushqty 3

Lighting

  • Work lightsqty 4

Tips

  • Set the programme around 2 to 3 hours of building time, with 15 minutes for arrival and registration and at least 20 minutes for the construction briefing and safe tool use.
  • Create one build station for every 4 to 6 participants. Put measuring tapes, pencils, clamps, screwdrivers and a cordless drill at each table, while keeping shared saws and the drill stand under supervision.
  • Prepare the wood before participants arrive. Have boards and wooden crates cut to size, and sort bamboo poles, hollow stems, tree slices, pine cones, wood chips and terracotta pots into clearly labelled groups.
  • Plan at least 1 volunteer for every 6 to 8 builders. Assign people to registration, tool safety, material replenishment and construction guidance instead of asking everyone to manage the whole session.
  • Check the weather forecast 48 hours beforehand if tables or party tents will be outside. Keep a covered workspace available, and test extension cords and power strips before opening the venue.

Frequently asked questions

How long does an insect hotel building day take?
Allow about 3 hours for a complete session: 15 minutes to receive participants, 20 minutes for instructions and safety, around 2 hours for building, and 25 minutes for tidying and closing. Add extra time if participants are cutting wood themselves.
How many people can build at one insect hotel station?
Plan for 4 to 6 people per table or workbench. This leaves enough room for materials and safe tool use; larger groups usually spend too much time waiting for a drill, clamp or volunteer.
When should I prepare the materials for an insect hotel workshop?
Check the shopping list and building materials at least 7 days before the event, then sort and prepare everything 1 to 2 days beforehand. Cut the wood and test the tools no later than the day before.
How many volunteers do I need for an insect hotel building day?
Use roughly 1 volunteer for every 6 to 8 participants, plus one person responsible for opening the venue and coordinating the programme. For 24 builders, plan on at least 4 volunteers so registration, safety and construction support are covered.