How to organise a tree planting day

A successful tree planting day is planned in two tracks: prepare the site and materials, then organise people and practical support. Start by checking the ground, confirming the planting plan and securing permission before ordering trees. In the final week, verify delivery, assign volunteer shifts, mark planting beds and share route details. On the day, clear instructions, labelled tools, water and a realistic backup plan prevent delays and avoidable damage to young trees.

The plan, step by step

Every task with its own sub-checklist, in the order you'll actually need them.

Preparations

  • 1

    Inspect venue site

    2 people

  • 2

    Determine the planting plan and tree species

    3 people

  • 3

    Request permission for planting

  • 4

    Check permits and notifications

  • 5

    Order trees and planting materials

    2 people

  • 6

    Confirm tree delivery

  • 7

    Recruit volunteers

    2 people

  • 8

    Send invitations

    2 people

  • 9

    Process registrations

    2 people

  • 10

    Collect dietary requirements

  • 11

    Calculate food and drink quantities

    2 people

  • 12

    Plan catering and groceries

    2 people

  • 13

    Arrange waste collection

  • 14

    Reserve restroom facilities

  • 15

    Inventory tools

    2 people

  • 16

    Reserve Missing Tools

  • 17

    Create volunteer schedule

    2 people

  • 18

    Prepare planting instructions

    2 people

  • 19

    Share route and parking information

  • 20

    Check the weather forecast

  • 21

    Confirm backup weather plan

    2 people

  • 22

    Store trees temporarily

    3 people

  • 23

    Mark out planting beds

    3 people

  • 24

    Pre-treat the planting holes

    4 people

  • 25

    Do the shopping

    3 people

  • 26

    Chill drinks

    2 people

  • 27

    Set out tableware and tools

    2 people

  • 28

    Print participant list

  • 29

    Share volunteer contact details

Event

  • 30

    Mark off the venue

    3 people

  • 31

    Build party tents

    4 people

  • 32

    Set up tables and chairs

    4 people

  • 33

    Set up the information desk

    2 people

  • 34

    Distribute tools per planting bed

    4 people

  • 35

    Bring trees to planting beds

    5 people

  • 36

    Set up the coffee and tea station

    2 people

  • 37

    Set up lunch buffet

    4 people

  • 38

    Post safety instructions

    2 people

  • 39

    Staff the registration desk

    2 people

  • 40

    Register participants

    2 people

  • 41

    Deliver the welcome speech

  • 42

    Give planting instructions

    2 people

  • 43

    Match volunteers to planting beds

    3 people

  • 44

    Lead tree planting

    8 people

  • 45

    Check planting depth

    3 people

  • 46

    Install tree stakes and ties

    4 people

  • 47

    Water trees immediately

    4 people

  • 48

    Issue tools safely

    2 people

  • 49

    Collect tools

    2 people

  • 50

    Refill the handwashing station

  • 51

    Serve coffee and tea

    2 people

  • 52

    Refill drinks

    2 people

  • 53

    Serve lunch buffet

    4 people

  • 54

    Mark vegetarian portions

  • 55

    Turn on evening lighting

    2 people

  • 56

    Present trees and planting beds

    2 people

  • 57

    Thank participants

  • 58

    Empty waste stations

    2 people

  • 59

    Collect used dishes

    2 people

Aftercare

  • 60

    Take down tables and chairs

    4 people

  • 61

    Take down party tents

    4 people

  • 62

    Collect leftover materials

    3 people

  • 63

    Wash dishes

    3 people

  • 64

    Clean the venue

    4 people

  • 65

    Take waste to the collection point

    2 people

  • 66

    Clean tools

    3 people

  • 67

    Return tools

    2 people

  • 68

    Store reusable materials

    2 people

  • 69

    Return rented materials

    2 people

  • 70

    Inspect new trees

    2 people

  • 71

    Water planting beds again

    3 people

  • 72

    Send thank-you message to participants

  • 73

    Schedule tree maintenance

    2 people

What to bring

Grouped the way you'd shop for it, with quantities.

Furniture

  • Party tentsqty 2
  • Tablesqty 8
  • Chairsqty 60
  • Beer table setsqty 4
  • Information desk
  • Blanketsqty 8

Equipment

  • Coolersqty 4
  • Coffee machinesqty 2
  • Kettlesqty 2
  • Extension cordsqty 4
  • Power stripsqty 4

Lighting

  • LED light stringsqty 6
  • Work lightsqty 4

Plant material

  • Treesqty 20
  • Tree stakesqty 40
  • Tree strapsqty 20
  • Compostqty 20
  • Tree barkqty 10
  • Pitchersqty 8
  • Water hosesqty 3

Tools

  • Shovelsqty 12
  • Scoopsqty 8
  • Rakesqty 6
  • Hoesqty 6
  • Wheelbarrowsqty 4
  • Bucketsqty 10
  • Work glovesqty 60
  • Pruning shearsqty 4

Safety

  • Safety gogglesqty 12
  • Safety vestsqty 12
  • First aid kitsqty 2
  • Crowd control barriersqty 8
  • Warning signsqty 6

Decorations

  • Information boardsqty 6
  • Direction arrowsqty 10
  • Name stickersqty 80
  • Markersqty 12

Tableware

  • Reusable cupsqty 100
  • Platesqty 80
  • Cutlery setsqty 80
  • Coffee cupsqty 60
  • Serving spoonsqty 8

Kitchen

  • Thermos flasksqty 6
  • Cutting boardsqty 4
  • Bread knivesqty 4
  • Serving plattersqty 10
  • Water jugsqty 6

Cleaning

  • Washing-up tubsqty 4
  • Spongesqty 12
  • Cleaning bucketsqty 4
  • Broom setsqty 3

Catering

  • Groceries

Tips

  • Inspect the site before choosing tree species or ordering supplies. Confirm access, ground conditions, planting areas, parking and whether temporary tree storage will be needed.
  • Allow time for permissions and notifications before setting a date. Check the requirements with the relevant authority several weeks ahead, because a planting plan may need approval before trees are ordered.
  • Plan volunteer work in short, supervised shifts rather than one large group. Give each team a clear task, provide work gloves and safety vests, and keep shovels, wheelbarrows and water hoses where teams can find them.
  • Confirm the tree delivery at least a few days before planting. Keep trees shaded and protected if they arrive early, and check that the number and species match the planting plan.
  • Prepare for weather and basic welfare, not just planting. Check the forecast the day before, confirm the backup plan, and arrange drinking water, food, restrooms, shelter and waste collection for the expected attendance.

Frequently asked questions

How far in advance should I organise a tree planting day?
Start planning at least 6 to 8 weeks ahead. That gives you time to inspect the site, obtain permission, order trees, recruit volunteers and arrange tools, catering and restrooms.
How many volunteers do I need for a tree planting day?
Base the number on the planting target and available supervision, then divide people into small teams. As a practical starting point, assign about 4 to 6 volunteers per team and one coordinator for every 3 to 4 teams.
When should the trees be delivered?
Arrange delivery 1 to 3 days before planting if you have suitable temporary storage, or on the morning of the event if the supplier can guarantee the time. Confirm the delivery several days in advance and keep roots protected from drying out.
What should I do if the weather is bad on planting day?
Make the decision at least 24 hours beforehand using the forecast and site conditions. Heavy rain, frozen ground, strong wind or unsafe access may require postponing the planting or moving the volunteer programme to a prepared backup plan.

Start this plan in Lizzt

Every task and item on this page, ready in your own event. Invite people, split the work, and see who has done what.

Organize this event for free with Lizzt

Organize for free and invite your contacts!